Feasibility of Recycling Bayer Process Red Mud for the Safety Backfill Mining of Layered Soft Bauxite under Coal Seams

The mining of layered soft bauxite under coal seams (BCS) will cause serious underground goaf disasters and surface Bayer process red mud (BRM) pollution. In order to realize the safe and efficient mining of BCS, the feasibility of recycling BRM as a backfilling aggregate was explored. A series of t...

Full description

Bibliographic Details
Main Authors: Shuai Li, Rui Zhang, Ru Feng, Boyi Hu, Guojun Wang, Haoxuan Yu
Format: Article
Language:English
Published: MDPI AG 2021-07-01
Series:Minerals
Subjects:
Online Access:https://www.mdpi.com/2075-163X/11/7/722
_version_ 1797526533046272000
author Shuai Li
Rui Zhang
Ru Feng
Boyi Hu
Guojun Wang
Haoxuan Yu
author_facet Shuai Li
Rui Zhang
Ru Feng
Boyi Hu
Guojun Wang
Haoxuan Yu
author_sort Shuai Li
collection DOAJ
description The mining of layered soft bauxite under coal seams (BCS) will cause serious underground goaf disasters and surface Bayer process red mud (BRM) pollution. In order to realize the safe and efficient mining of BCS, the feasibility of recycling BRM as a backfilling aggregate was explored. A series of tests were conducted to prevent the pollution diversion of BRM from surface storage to underground goafs, and a numerical simulation analysis of the backfilling mining process was carried out based on FLAC<sup>3D</sup> to protect the overlying coal seam. The results show that: under the action of encapsulation, solidification and inhibiting precipitation from cementitious materials, the leaching concentration of harmful substances in red mud-based cemented backfill (RCB) can be reduced 70% more than fresh BRM. Mining disturbance redistributes the in-situ stress field of overlying strata; normal backfilling can not only reduce the pressure stress of pillars, but also release the tensile stress in the roof and floor from +0.4956 MPa to −0.1992 MPa, effectively preventing roof subsidence. Since the creep damage process of past backfill will absorb and dissipate lots of energy, the disturbance range caused by backfill mining is controlled within 3 m, which is only 10% of the open-stope method.
first_indexed 2024-03-10T09:31:25Z
format Article
id doaj.art-5da4eb1569c44a94bf55e6649e8714c7
institution Directory Open Access Journal
issn 2075-163X
language English
last_indexed 2024-03-10T09:31:25Z
publishDate 2021-07-01
publisher MDPI AG
record_format Article
series Minerals
spelling doaj.art-5da4eb1569c44a94bf55e6649e8714c72023-11-22T04:27:34ZengMDPI AGMinerals2075-163X2021-07-0111772210.3390/min11070722Feasibility of Recycling Bayer Process Red Mud for the Safety Backfill Mining of Layered Soft Bauxite under Coal SeamsShuai Li0Rui Zhang1Ru Feng2Boyi Hu3Guojun Wang4Haoxuan Yu5School of Resources and Safety Engineering, Central South University, Changsha 410083, ChinaSchool of Resources and Safety Engineering, Central South University, Changsha 410083, ChinaSchool of Resources and Safety Engineering, Central South University, Changsha 410083, ChinaSchool of Resources and Safety Engineering, Central South University, Changsha 410083, ChinaSchool of Resources and Safety Engineering, Central South University, Changsha 410083, ChinaSchool of Resources and Safety Engineering, Central South University, Changsha 410083, ChinaThe mining of layered soft bauxite under coal seams (BCS) will cause serious underground goaf disasters and surface Bayer process red mud (BRM) pollution. In order to realize the safe and efficient mining of BCS, the feasibility of recycling BRM as a backfilling aggregate was explored. A series of tests were conducted to prevent the pollution diversion of BRM from surface storage to underground goafs, and a numerical simulation analysis of the backfilling mining process was carried out based on FLAC<sup>3D</sup> to protect the overlying coal seam. The results show that: under the action of encapsulation, solidification and inhibiting precipitation from cementitious materials, the leaching concentration of harmful substances in red mud-based cemented backfill (RCB) can be reduced 70% more than fresh BRM. Mining disturbance redistributes the in-situ stress field of overlying strata; normal backfilling can not only reduce the pressure stress of pillars, but also release the tensile stress in the roof and floor from +0.4956 MPa to −0.1992 MPa, effectively preventing roof subsidence. Since the creep damage process of past backfill will absorb and dissipate lots of energy, the disturbance range caused by backfill mining is controlled within 3 m, which is only 10% of the open-stope method.https://www.mdpi.com/2075-163X/11/7/722Bayer process red mud (BRM)red mud-based cemented backfill (RCB)backfill mining technologylayered soft rocksbauxite under coal seams (BCS)
spellingShingle Shuai Li
Rui Zhang
Ru Feng
Boyi Hu
Guojun Wang
Haoxuan Yu
Feasibility of Recycling Bayer Process Red Mud for the Safety Backfill Mining of Layered Soft Bauxite under Coal Seams
Minerals
Bayer process red mud (BRM)
red mud-based cemented backfill (RCB)
backfill mining technology
layered soft rocks
bauxite under coal seams (BCS)
title Feasibility of Recycling Bayer Process Red Mud for the Safety Backfill Mining of Layered Soft Bauxite under Coal Seams
title_full Feasibility of Recycling Bayer Process Red Mud for the Safety Backfill Mining of Layered Soft Bauxite under Coal Seams
title_fullStr Feasibility of Recycling Bayer Process Red Mud for the Safety Backfill Mining of Layered Soft Bauxite under Coal Seams
title_full_unstemmed Feasibility of Recycling Bayer Process Red Mud for the Safety Backfill Mining of Layered Soft Bauxite under Coal Seams
title_short Feasibility of Recycling Bayer Process Red Mud for the Safety Backfill Mining of Layered Soft Bauxite under Coal Seams
title_sort feasibility of recycling bayer process red mud for the safety backfill mining of layered soft bauxite under coal seams
topic Bayer process red mud (BRM)
red mud-based cemented backfill (RCB)
backfill mining technology
layered soft rocks
bauxite under coal seams (BCS)
url https://www.mdpi.com/2075-163X/11/7/722
work_keys_str_mv AT shuaili feasibilityofrecyclingbayerprocessredmudforthesafetybackfillminingoflayeredsoftbauxiteundercoalseams
AT ruizhang feasibilityofrecyclingbayerprocessredmudforthesafetybackfillminingoflayeredsoftbauxiteundercoalseams
AT rufeng feasibilityofrecyclingbayerprocessredmudforthesafetybackfillminingoflayeredsoftbauxiteundercoalseams
AT boyihu feasibilityofrecyclingbayerprocessredmudforthesafetybackfillminingoflayeredsoftbauxiteundercoalseams
AT guojunwang feasibilityofrecyclingbayerprocessredmudforthesafetybackfillminingoflayeredsoftbauxiteundercoalseams
AT haoxuanyu feasibilityofrecyclingbayerprocessredmudforthesafetybackfillminingoflayeredsoftbauxiteundercoalseams