Lean System-Based Tool for Housing Projects Management in the Pandemic Period
This research describes a detailed analysis of the enactment of a lean Tool, the Last Planner System during pandemic period which helps in optimizing resources for better coordination among all stakeholders in a pandemic period. The LPS, as it is known, focusses on minimizing factors such as uncerta...
Main Authors: | S. Sundararajan, T. Ch. Madhavi |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-10-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/13/10/2507 |
Similar Items
-
BIM-LEAN as a Methodology to Save Execution Costs in Building Construction—An Experience under the Spanish Framework
by: María Dolores Andújar-Montoya, et al.
Published: (2020-03-01) -
Applying Level of Detail in a BIM-Based Project: An Overall Process for Lean Design Management
by: Petteri Uusitalo, et al.
Published: (2019-05-01) -
Lean and Flexible Project Delivery
by: Hajnalka Vaagen, et al.
Published: (2021-10-01) -
Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review
by: Ajay Kumar Agrawal, et al.
Published: (2024-04-01) -
The Last Planner System Style of Planning: Its Basis in Learning Theory
by: Bo Terje Kalsaas
Published: (2012-07-01)