Discrete-Element Analysis of the Excavation Performance of an EPB Shield TBM under Different Operating Conditions
This study used a discrete-element analysis to predict the excavation performance of a 7.73 m-diameter earth pressure balance (EPB) shield tunnel boring machine (TBM). The simulation mainly predicted several excavation performance indicators for the machine, under different operating conditions. The...
Main Authors: | Byungkwan Park, Chulho Lee, Soon-Wook Choi, Tae-Ho Kang, Soo-Ho Chang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-05-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/11/11/5119 |
Similar Items
-
An Operating Model for an EPB Shield TBM Simulator by the Correlation Analysis of Operational Actions and Mechanical Responses
by: Byungkwan Park, et al.
Published: (2021-12-01) -
A Geometric Model for a Shield TBM Steering Simulator
by: Byungkwan Park, et al.
Published: (2023-09-01) -
Evaluation of the Geo-Mechanical Properties Property Recovery in Time of Conditioned Soil for EPB-TBM Tunneling
by: Andrea Carigi, et al.
Published: (2020-11-01) -
THE PREDICTION OF EPB-TBM PERFORMANCE USING FIREFLY ALGORITHMS AND PARTICLE SWARM OPTIMIZATION
by: Erfan Khoshzaher, et al.
Published: (2023-01-01) -
Soil conditioning tests of clay for EPB tunnelling
by: C. Todaro, et al.
Published: (2022-08-01)