Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study
Optimising energy use in systems and buildings is crucial to reduce climate change. This paper aims to address the gap in knowledge for pico-hydropower (<5 kW) that has been identified as an area of untapped potential in the water industries. A literature review and multivariate analysis are used...
Main Authors: | Sascha Thyer, Tony White |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2023-06-01
|
Series: | Heliyon |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2405844023039166 |
Similar Items
-
The Regulatory Noose: Logan City’s Adventures in Micro-Hydropower
by: Megan Hansen, et al.
Published: (2016-06-01) -
Hydropower Generation Through Pump as Turbine: Experimental Study and Potential Application to Small-Scale WDN
by: Matteo Postacchini, et al.
Published: (2020-03-01) -
Axial Flux Permanent Magnet Synchronous Generators for Pico Hydropower Application: A Parametrical Study
by: Vincenzo Di Dio, et al.
Published: (2022-09-01) -
Design and implementation of a crossflow turbine for Pico hydropower electricity generation
by: C.H. Achebe, et al.
Published: (2020-07-01) -
Prototype Development of an Automatic and Floating Structured Hydropower Plant
by: Samandar Khan Afridi, et al.
Published: (2023-01-01)