3D Modelling of a Tunnel Re-excavation in Soft Ground
The construction of the shallow tunnel at Brezno started using the Pre-Vault Method. The tunnel excavation, in complicated geological conditions, led to many difficulties which finally resulted in a collapse, when a significant part of the temporary tunnel lining collapsed. Various options for re-ex...
Main Author: | M. Hilar |
---|---|
Format: | Article |
Language: | English |
Published: |
CTU Central Library
2011-01-01
|
Series: | Acta Polytechnica |
Subjects: | |
Online Access: | https://ojs.cvut.cz/ojs/index.php/ap/article/view/1378 |
Similar Items
-
Useful concepts for application of new Austrian tunnelling method in tunnel construction (NATM)
by: Jovčlć Vojkan, et al.
Published: (2015-01-01) -
Stability Evaluation of TBM Pilot Tunnels to Rear Blasting Using the Protection Shield
by: Suk-Min Kong, et al.
Published: (2021-02-01) -
A HEADRACE TUNNEL RECONSTRUCTION IN TURKEY
by: Matouš Hilar, et al.
Published: (2019-07-01) -
Study of the Behavior of Excavations and Support Systems for an Alternative Construction Model of the Tunnels in Mexico City
by: Antonio Alonso-Jiménez, et al.
Published: (2023-03-01) -
STRESSES IN MULTIPHASE EXCAVATION OF TUNELL
by: Lidija Frgić, et al.
Published: (2003-12-01)