Investigating the adaptability and implementation of computational design methods in concept design taking plasterboard opportunities for dimensional coordination and waste reduction as a case study
Construction material offcuts is a data problem that can largely be avoided by dimensional coordination during concept design. Besides the environmental benefits, early phase coordination is beneficial to the overall design process as it integrates information not typically considered until later in...
Main Authors: | Omar Majzoub, M. Hank Haeusler, Sisi Zlatanova |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2023-10-01
|
Series: | Frontiers of Architectural Research |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S209526352300047X |
Similar Items
-
Gypsum plasterboard
Published: (1985) -
Jointing materials for plasterboard
by: 8096 British Standards Institution -
Features of mycobiota of plasterboard constructions in premises with different operating conditions
by: Yu. B. Pysmenna, et al.
Published: (2017-09-01) -
Hyperspectral Imaging Sorting of Refurbishment Plasterboard Waste
by: Miguel Castro-Díaz, et al.
Published: (2023-02-01) -
DETECTION OF THE PRESENCE OF MICROORGANISMS DURING PRODUCTION OF PLASTERBOARD
by: Hana Sekavová, et al.
Published: (2021-04-01)