The effect of intake channel length on water temperature at the intake point of the power plant at Muara Karang power plant
Muara Karang Power Plant (MKPP) is one of the main power plants on Java Island in Indonesia. Presently, the Jakarta provincial government has issued a reclamation project on Island G in the marine waters around MKPP. This reclamation effort is predicted to lead to a rise in the seawater temperature...
Main Authors: | Mardi Wibowo, Hanah Khoirunnisa, Dinar Catur Istiyanto, Aloysius Bagyo Widagdo, Khusnul Setia Wardani |
---|---|
Format: | Article |
Language: | English |
Published: |
Diponegoro University
2024-01-01
|
Series: | International Journal of Renewable Energy Development |
Subjects: | |
Online Access: | https://ijred.cbiore.id/index.php/ijred/article/view/57680 |
Similar Items
-
Optimization Analysis of Intake and Outlet of a Power Plant in Semi-enclosed Waters
by: Liyuan QIAO, et al.
Published: (2021-01-01) -
Pemodelan Pola Sedimentasi di Muara Cisadane untuk Mendukung Pengembangan Terpadu Pesisir Ibukota Negara
by: Mardi Wibowo, et al.
Published: (2022-06-01) -
Discussion on the Water Intake and Drainage Schemes of LNG Terminal Using the Thermal Drainage from Power Plant
by: FENG Daorong, et al.
Published: (2022-05-01) -
Fluid/Thermal/Structural Coupling Simulation on Effects of Forebody-Inlet Thermal Deformation on Intake Performance
by: Si-yi LI, et al.
Published: (2023-07-01) -
The effect of reservoir geometry on the critical submergence depth in hydroelectric power plants intake
by: Reza Roshan, et al.
Published: (2023-06-01)