Summary: | The problem of optimally increasing the size of existing wind farms has not been investigated in the literature. In this paper, a proposed wind farm layout upgrade by adding different (in type and/or hub height) commercial turbines to an existing farm is introduced and optimized. Three proposed upgraded layouts are considered: internal grid, external grid, and external unstructured. The manufacturer’s power curve and a general representation for thrust coefficient are used in power and wake calculations, respectively. A simple field-based model is implemented and both offshore and onshore conditions are considered. A genetic algorithm is used for the optimization. The trade-off range between energy production and cost of energy is investigated by considering three objective functions, individually: (1) annual energy production; (2) cost of added energy; and (3) cost of total energy. The proposed upgraded layouts are determined for the Horns Rev 1 offshore wind farm. The results showed a wide range of suitable upgrade scenarios depending on the upgraded layout and the optimization objective. The farm energy production is increased by 190−336% with a corresponding increase in the total cost by 147−720%. The external upgrade offers more energy production but with much more cost. The unstructured layouts showed clear superiority over the grid ones by providing much lower cost of energy.
|