Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot

Electrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. There...

Full description

Bibliographic Details
Main Authors: Jintang Shi, Haodong Li, Daoqi Wang, Pieter Vansteenwegen
Format: Article
Language:English
Published: IEEE 2024-01-01
Series:IEEE Access
Subjects:
Online Access:https://ieeexplore.ieee.org/document/10443366/
_version_ 1827308110811758592
author Jintang Shi
Haodong Li
Daoqi Wang
Pieter Vansteenwegen
author_facet Jintang Shi
Haodong Li
Daoqi Wang
Pieter Vansteenwegen
author_sort Jintang Shi
collection DOAJ
description Electrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. Therefore, frequent modifications to the original SSS plan and rescheduling of some EMUs are required to recover the feasibility of the plan. This paper considers a rescheduling method for integrating train shunting, service scheduling and routing at EMU depots with various layouts. In this paper, the movement process of EMUs at depots is represented with the help of a two-layer time-space network. A heuristic algorithm for rescheduling is designed. Case studies based on a real-world depot show that the heuristic can repair the original SSS plan in 180 seconds while ensuring that the new SSS plan is as close as possible to the original SSS plan.
first_indexed 2024-04-24T18:52:48Z
format Article
id doaj.art-60d113bb008f40b485a937a5e0e02391
institution Directory Open Access Journal
issn 2169-3536
language English
last_indexed 2024-04-24T18:52:48Z
publishDate 2024-01-01
publisher IEEE
record_format Article
series IEEE Access
spelling doaj.art-60d113bb008f40b485a937a5e0e023912024-03-26T17:49:07ZengIEEEIEEE Access2169-35362024-01-0112386153863010.1109/ACCESS.2024.336880710443366Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway DepotJintang Shi0https://orcid.org/0000-0002-9073-749XHaodong Li1https://orcid.org/0000-0002-6774-9548Daoqi Wang2Pieter Vansteenwegen3https://orcid.org/0000-0002-5646-669XSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing, ChinaSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing, ChinaTransportation Department, China State Railway Group Company Ltd., Beijing, ChinaKU Leuven Institute for Mobility—CIB, KU Leuven, Leuven, BelgiumElectrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. Therefore, frequent modifications to the original SSS plan and rescheduling of some EMUs are required to recover the feasibility of the plan. This paper considers a rescheduling method for integrating train shunting, service scheduling and routing at EMU depots with various layouts. In this paper, the movement process of EMUs at depots is represented with the help of a two-layer time-space network. A heuristic algorithm for rescheduling is designed. Case studies based on a real-world depot show that the heuristic can repair the original SSS plan in 180 seconds while ensuring that the new SSS plan is as close as possible to the original SSS plan.https://ieeexplore.ieee.org/document/10443366/Maintenancereschedulingservice schedulingtime-space networktrain unit shunting
spellingShingle Jintang Shi
Haodong Li
Daoqi Wang
Pieter Vansteenwegen
Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
IEEE Access
Maintenance
rescheduling
service scheduling
time-space network
train unit shunting
title Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
title_full Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
title_fullStr Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
title_full_unstemmed Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
title_short Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
title_sort reschedule the shunting and service scheduling plan after disturbances at a chinese high speed railway depot
topic Maintenance
rescheduling
service scheduling
time-space network
train unit shunting
url https://ieeexplore.ieee.org/document/10443366/
work_keys_str_mv AT jintangshi rescheduletheshuntingandserviceschedulingplanafterdisturbancesatachinesehighspeedrailwaydepot
AT haodongli rescheduletheshuntingandserviceschedulingplanafterdisturbancesatachinesehighspeedrailwaydepot
AT daoqiwang rescheduletheshuntingandserviceschedulingplanafterdisturbancesatachinesehighspeedrailwaydepot
AT pietervansteenwegen rescheduletheshuntingandserviceschedulingplanafterdisturbancesatachinesehighspeedrailwaydepot