Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
Electrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. There...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2024-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/10443366/ |
_version_ | 1827308110811758592 |
---|---|
author | Jintang Shi Haodong Li Daoqi Wang Pieter Vansteenwegen |
author_facet | Jintang Shi Haodong Li Daoqi Wang Pieter Vansteenwegen |
author_sort | Jintang Shi |
collection | DOAJ |
description | Electrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. Therefore, frequent modifications to the original SSS plan and rescheduling of some EMUs are required to recover the feasibility of the plan. This paper considers a rescheduling method for integrating train shunting, service scheduling and routing at EMU depots with various layouts. In this paper, the movement process of EMUs at depots is represented with the help of a two-layer time-space network. A heuristic algorithm for rescheduling is designed. Case studies based on a real-world depot show that the heuristic can repair the original SSS plan in 180 seconds while ensuring that the new SSS plan is as close as possible to the original SSS plan. |
first_indexed | 2024-04-24T18:52:48Z |
format | Article |
id | doaj.art-60d113bb008f40b485a937a5e0e02391 |
institution | Directory Open Access Journal |
issn | 2169-3536 |
language | English |
last_indexed | 2024-04-24T18:52:48Z |
publishDate | 2024-01-01 |
publisher | IEEE |
record_format | Article |
series | IEEE Access |
spelling | doaj.art-60d113bb008f40b485a937a5e0e023912024-03-26T17:49:07ZengIEEEIEEE Access2169-35362024-01-0112386153863010.1109/ACCESS.2024.336880710443366Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway DepotJintang Shi0https://orcid.org/0000-0002-9073-749XHaodong Li1https://orcid.org/0000-0002-6774-9548Daoqi Wang2Pieter Vansteenwegen3https://orcid.org/0000-0002-5646-669XSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing, ChinaSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing, ChinaTransportation Department, China State Railway Group Company Ltd., Beijing, ChinaKU Leuven Institute for Mobility—CIB, KU Leuven, Leuven, BelgiumElectrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. Therefore, frequent modifications to the original SSS plan and rescheduling of some EMUs are required to recover the feasibility of the plan. This paper considers a rescheduling method for integrating train shunting, service scheduling and routing at EMU depots with various layouts. In this paper, the movement process of EMUs at depots is represented with the help of a two-layer time-space network. A heuristic algorithm for rescheduling is designed. Case studies based on a real-world depot show that the heuristic can repair the original SSS plan in 180 seconds while ensuring that the new SSS plan is as close as possible to the original SSS plan.https://ieeexplore.ieee.org/document/10443366/Maintenancereschedulingservice schedulingtime-space networktrain unit shunting |
spellingShingle | Jintang Shi Haodong Li Daoqi Wang Pieter Vansteenwegen Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot IEEE Access Maintenance rescheduling service scheduling time-space network train unit shunting |
title | Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot |
title_full | Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot |
title_fullStr | Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot |
title_full_unstemmed | Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot |
title_short | Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot |
title_sort | reschedule the shunting and service scheduling plan after disturbances at a chinese high speed railway depot |
topic | Maintenance rescheduling service scheduling time-space network train unit shunting |
url | https://ieeexplore.ieee.org/document/10443366/ |
work_keys_str_mv | AT jintangshi rescheduletheshuntingandserviceschedulingplanafterdisturbancesatachinesehighspeedrailwaydepot AT haodongli rescheduletheshuntingandserviceschedulingplanafterdisturbancesatachinesehighspeedrailwaydepot AT daoqiwang rescheduletheshuntingandserviceschedulingplanafterdisturbancesatachinesehighspeedrailwaydepot AT pietervansteenwegen rescheduletheshuntingandserviceschedulingplanafterdisturbancesatachinesehighspeedrailwaydepot |