Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
Electrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. There...
| Main Authors: | Jintang Shi, Haodong Li, Daoqi Wang, Pieter Vansteenwegen |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
IEEE
2024-01-01
|
| Series: | IEEE Access |
| Subjects: | |
| Online Access: | https://ieeexplore.ieee.org/document/10443366/ |
Similar Items
-
Emergency Repair Scheduling Model for Road Network Integrating Rescheduling Feature
by: Shu-Shun Liu, et al.
Published: (2021-02-01) -
Heuristic approach to train rescheduling
by: Mladenović Snežana, et al.
Published: (2007-01-01) -
Quantification of Opioid Prescription Practice Changes Due to Hydrocodone Combination Product Rescheduling in an Academic Pain Clinic
by: Ngo J, et al.
Published: (2020-08-01) -
Adaptive Production Rescheduling System for Managing Unforeseen Disruptions
by: Andy J. Figueroa, et al.
Published: (2024-11-01) -
A Mixed Integer Linear Programming Model with Heuristic Improvements for Single-Track Railway Rescheduling Problem
by: Gökçe Aydın, et al.
Published: (2023-01-01)