An Improved Elephant Herding Optimization for Energy-Saving Assembly Job Shop Scheduling Problem with Transportation Times
The energy-saving scheduling problem (ESSP) has gained increasing attention of researchers in the manufacturing field. However, there is a lack of studies on ESSPs in the assembly job shop environment. In contrast with traditional scheduling problems, the assembly job shop scheduling problem (AJSP)...
Main Authors: | Tianhua Jiang, Lu Liu, Huiqi Zhu, Yaping Li |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-10-01
|
Series: | Axioms |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-1680/11/10/561 |
Similar Items
-
Energy-Saving Scheduling for Flexible Job Shop Problem with AGV Transportation Considering Emergencies
by: Hongliang Zhang, et al.
Published: (2023-02-01) -
Neural networks for job-shop scheduling /
by: 298653 Willems, T. M., et al. -
Predictable scheduling of a job shop subject to breakdowns /
by: 264160 Sanjay V. Mehta, et al. -
Modified Migrating Birds Optimization for Energy-Aware Flexible Job Shop Scheduling Problem
by: Hongchan Li, et al.
Published: (2020-02-01) -
A New Interior Search Algorithm for Energy-Saving Flexible Job Shop Scheduling with Overlapping Operations and Transportation Times
by: Lu Liu, et al.
Published: (2022-06-01)