Research on Construction Schedule Optimization of Assembly Building Based on NSGA-II
Considering multiple possible scenarios in the process of project construction, the prefabricated project scheduling problem is studied in combination with the theory of multi-mode resource-constrained project scheduling problem. Multi-objective multi-mode resource-constrained project scheduling mod...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/25/e3sconf_caes2020_06055.pdf |
Summary: | Considering multiple possible scenarios in the process of project construction, the prefabricated project scheduling problem is studied in combination with the theory of multi-mode resource-constrained project scheduling problem. Multi-objective multi-mode resource-constrained project scheduling model with time/robustness trad-offs was constructed. Next, the adjusted non-dominated genetic algorithm (NSGA-II) was designed to solve the model. Finally, the proposed model and algorithm were implicated to a real project, in order that research achievement can guide managers to make decisions and invest resources scientifically and reasonably. |
---|---|
ISSN: | 2267-1242 |