Research on Construction Schedule Optimization of Assembly Building Based on NSGA-II
Considering multiple possible scenarios in the process of project construction, the prefabricated project scheduling problem is studied in combination with the theory of multi-mode resource-constrained project scheduling problem. Multi-objective multi-mode resource-constrained project scheduling mod...
Main Authors: | Wang Ru, Lian Jing |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/25/e3sconf_caes2020_06055.pdf |
Similar Items
-
Multi‐objective optimization of main bearing assembly structure based on improved NSGA‐II
by: Xin Zhao, et al.
Published: (2022-01-01) -
A Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II
by: Masoud Rabbani, et al.
Published: (2016-11-01) -
Multi-objective optimization of water scheduling in irrigation canal network using NSGA-II
by: Elham Darvishi, et al.
Published: (2019-12-01) -
Multitask scheduling on cloud additive manufacturing using NSGA-II
by: Muchamad Sugarindra, et al.
Published: (2024-11-01) -
Research on order batching optimization based on improved NSGA-II algorithm.
by: Huiyue Xu, et al.
Published: (2025-01-01)