Vibration control technology of reheat steam hot section pipeline of 135MW unit
Based on the on-site cold and hot state inspection of the four pipelines of a 350MW unit in Shandong, combined with the review and calculation of stress, design and installation data, operation and maintenance records and other data, this paper formulates a practical adjustment plan and construction...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2022-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2022/19/e3sconf_esat2022_02019.pdf |
_version_ | 1818237172611809280 |
---|---|
author | Yuan Tangqing Yuan Fei Li Jidong Zhang Huakai Jian Mingjian |
author_facet | Yuan Tangqing Yuan Fei Li Jidong Zhang Huakai Jian Mingjian |
author_sort | Yuan Tangqing |
collection | DOAJ |
description | Based on the on-site cold and hot state inspection of the four pipelines of a 350MW unit in Shandong, combined with the review and calculation of stress, design and installation data, operation and maintenance records and other data, this paper formulates a practical adjustment plan and construction scheme, implements comprehensive adjustment and treatment of the four pipeline supports and hangers, basically restores the normal working state of the supports and hangers and pipelines, and ensures the safe operation of the unit. |
first_indexed | 2024-12-12T12:21:32Z |
format | Article |
id | doaj.art-6252fbaece6d43bd800d5eed4c887c8a |
institution | Directory Open Access Journal |
issn | 2267-1242 |
language | English |
last_indexed | 2024-12-12T12:21:32Z |
publishDate | 2022-01-01 |
publisher | EDP Sciences |
record_format | Article |
series | E3S Web of Conferences |
spelling | doaj.art-6252fbaece6d43bd800d5eed4c887c8a2022-12-22T00:24:39ZengEDP SciencesE3S Web of Conferences2267-12422022-01-013520201910.1051/e3sconf/202235202019e3sconf_esat2022_02019Vibration control technology of reheat steam hot section pipeline of 135MW unitYuan Tangqing0Yuan Fei1Li Jidong2Zhang Huakai3Jian Mingjian4Shandong Electric Power Industrial Boiler and Pressure Vessel Inspection Center Co., LtdChina Power Construction Group Shandong Electric Power Construction Co., Ltd.Shandong Electric Power Industrial Boiler and Pressure Vessel Inspection Center Co., LtdElectric Power Research Institute of State Grid Shandong electric power companyElectric Power Research Institute of State Grid Shandong electric power companyBased on the on-site cold and hot state inspection of the four pipelines of a 350MW unit in Shandong, combined with the review and calculation of stress, design and installation data, operation and maintenance records and other data, this paper formulates a practical adjustment plan and construction scheme, implements comprehensive adjustment and treatment of the four pipeline supports and hangers, basically restores the normal working state of the supports and hangers and pipelines, and ensures the safe operation of the unit.https://www.e3s-conferences.org/articles/e3sconf/pdf/2022/19/e3sconf_esat2022_02019.pdf |
spellingShingle | Yuan Tangqing Yuan Fei Li Jidong Zhang Huakai Jian Mingjian Vibration control technology of reheat steam hot section pipeline of 135MW unit E3S Web of Conferences |
title | Vibration control technology of reheat steam hot section pipeline of 135MW unit |
title_full | Vibration control technology of reheat steam hot section pipeline of 135MW unit |
title_fullStr | Vibration control technology of reheat steam hot section pipeline of 135MW unit |
title_full_unstemmed | Vibration control technology of reheat steam hot section pipeline of 135MW unit |
title_short | Vibration control technology of reheat steam hot section pipeline of 135MW unit |
title_sort | vibration control technology of reheat steam hot section pipeline of 135mw unit |
url | https://www.e3s-conferences.org/articles/e3sconf/pdf/2022/19/e3sconf_esat2022_02019.pdf |
work_keys_str_mv | AT yuantangqing vibrationcontroltechnologyofreheatsteamhotsectionpipelineof135mwunit AT yuanfei vibrationcontroltechnologyofreheatsteamhotsectionpipelineof135mwunit AT lijidong vibrationcontroltechnologyofreheatsteamhotsectionpipelineof135mwunit AT zhanghuakai vibrationcontroltechnologyofreheatsteamhotsectionpipelineof135mwunit AT jianmingjian vibrationcontroltechnologyofreheatsteamhotsectionpipelineof135mwunit |