PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUT
The construction industry is experiencing a gradual shift towards digitization. Currently, this digitization is relatively limited, but the need for that digitization as well as for automation is large. Digitization in road construction in particular is even more dire than in the construction indust...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Copernicus Publications
2023-12-01
|
Series: | The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences |
Online Access: | https://isprs-archives.copernicus.org/articles/XLVIII-1-W2-2023/1627/2023/isprs-archives-XLVIII-1-W2-2023-1627-2023.pdf |
_version_ | 1797391220020871168 |
---|---|
author | H. De Winter H. De Winter M. Bassier S. De Geyter S. De Geyter M. Vergauwen |
author_facet | H. De Winter H. De Winter M. Bassier S. De Geyter S. De Geyter M. Vergauwen |
author_sort | H. De Winter |
collection | DOAJ |
description | The construction industry is experiencing a gradual shift towards digitization. Currently, this digitization is relatively limited, but the need for that digitization as well as for automation is large. Digitization in road construction in particular is even more dire than in the construction industry in general. It involves various tasks such as progress, quality and quantity analyses. In this paper a proof of concept is presented on the possible automation of accuracy analysis in road construction throughout the construction of a road. The used data is 3D as-design data on the one hand and multiple 3D as-built data on the other hand, with the former being modelled using the regulations formulated by the Flemish ”Departement van Mobiliteit en Openbare Werken” (MOW), and the latter being captured using a Real Time Kinematic Unmanned Aerial Vehicle (RTK-UAV). The feasibility of the proposed workflow is examined using a real test case. Conducting these quality checks regularly will provide a clear overview of the construction site progress. In this way, any delays or errors can be detected quickly, resulting in higher quality and reduced failure costs. |
first_indexed | 2024-03-08T23:28:43Z |
format | Article |
id | doaj.art-627261912bd54613a9e1d1da07a6791c |
institution | Directory Open Access Journal |
issn | 1682-1750 2194-9034 |
language | English |
last_indexed | 2024-03-08T23:28:43Z |
publishDate | 2023-12-01 |
publisher | Copernicus Publications |
record_format | Article |
series | The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences |
spelling | doaj.art-627261912bd54613a9e1d1da07a6791c2023-12-14T16:12:27ZengCopernicus PublicationsThe International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences1682-17502194-90342023-12-01XLVIII-1-W2-20231627163410.5194/isprs-archives-XLVIII-1-W2-2023-1627-2023PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUTH. De Winter0H. De Winter1M. Bassier2S. De Geyter3S. De Geyter4M. Vergauwen5Dept. of Civil Engineering – Geomatics, KU Leuven, Faculty of Engineering Technology, Ghent, BelgiumDIRK BAUWENS NV, Evergem, BelgiumDept. of Civil Engineering – Geomatics, KU Leuven, Faculty of Engineering Technology, Ghent, BelgiumDept. of Civil Engineering – Geomatics, KU Leuven, Faculty of Engineering Technology, Ghent, BelgiumMEET HET BV, Mariakerke, BelgiumDept. of Civil Engineering – Geomatics, KU Leuven, Faculty of Engineering Technology, Ghent, BelgiumThe construction industry is experiencing a gradual shift towards digitization. Currently, this digitization is relatively limited, but the need for that digitization as well as for automation is large. Digitization in road construction in particular is even more dire than in the construction industry in general. It involves various tasks such as progress, quality and quantity analyses. In this paper a proof of concept is presented on the possible automation of accuracy analysis in road construction throughout the construction of a road. The used data is 3D as-design data on the one hand and multiple 3D as-built data on the other hand, with the former being modelled using the regulations formulated by the Flemish ”Departement van Mobiliteit en Openbare Werken” (MOW), and the latter being captured using a Real Time Kinematic Unmanned Aerial Vehicle (RTK-UAV). The feasibility of the proposed workflow is examined using a real test case. Conducting these quality checks regularly will provide a clear overview of the construction site progress. In this way, any delays or errors can be detected quickly, resulting in higher quality and reduced failure costs.https://isprs-archives.copernicus.org/articles/XLVIII-1-W2-2023/1627/2023/isprs-archives-XLVIII-1-W2-2023-1627-2023.pdf |
spellingShingle | H. De Winter H. De Winter M. Bassier S. De Geyter S. De Geyter M. Vergauwen PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUT The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences |
title | PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUT |
title_full | PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUT |
title_fullStr | PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUT |
title_full_unstemmed | PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUT |
title_short | PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUT |
title_sort | phased accuracy analysis in road construction using bim and photogrammetric output |
url | https://isprs-archives.copernicus.org/articles/XLVIII-1-W2-2023/1627/2023/isprs-archives-XLVIII-1-W2-2023-1627-2023.pdf |
work_keys_str_mv | AT hdewinter phasedaccuracyanalysisinroadconstructionusingbimandphotogrammetricoutput AT hdewinter phasedaccuracyanalysisinroadconstructionusingbimandphotogrammetricoutput AT mbassier phasedaccuracyanalysisinroadconstructionusingbimandphotogrammetricoutput AT sdegeyter phasedaccuracyanalysisinroadconstructionusingbimandphotogrammetricoutput AT sdegeyter phasedaccuracyanalysisinroadconstructionusingbimandphotogrammetricoutput AT mvergauwen phasedaccuracyanalysisinroadconstructionusingbimandphotogrammetricoutput |