Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan

To complete customer's demand so company must make a plan with using production schedule. Some diffrculties usually happen in shop floor level is a new job which is put in a production schedule that have arranged before. So that the old production schedule have to revised by reschedulling. The...

Full description

Bibliographic Details
Main Author: Eti Kristinawati
Format: Article
Language:English
Published: Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang 2010-04-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:http://ejournal.umm.ac.id/index.php/industri/article/view/240
_version_ 1819199233863974912
author Eti Kristinawati
author_facet Eti Kristinawati
author_sort Eti Kristinawati
collection DOAJ
description To complete customer's demand so company must make a plan with using production schedule. Some diffrculties usually happen in shop floor level is a new job which is put in a production schedule that have arranged before. So that the old production schedule have to revised by reschedulling. The procedure that be used to schedule the real time production consist of n job m machine is algoritm of Hueristik Dispatching Rule Shorted Processing Time (SPT) method to minimize mean tardiness and makespan.
first_indexed 2024-12-23T03:13:05Z
format Article
id doaj.art-635207374b20459b95f4cec2546a1d45
institution Directory Open Access Journal
issn 1978-1431
2527-4112
language English
last_indexed 2024-12-23T03:13:05Z
publishDate 2010-04-01
publisher Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
record_format Article
series Jurnal Teknik Industri
spelling doaj.art-635207374b20459b95f4cec2546a1d452022-12-21T18:02:13ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri1978-14312527-41122010-04-0131556510.22219/JTIUMM.Vol3.No1.55-65236Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan MakespanEti KristinawatiTo complete customer's demand so company must make a plan with using production schedule. Some diffrculties usually happen in shop floor level is a new job which is put in a production schedule that have arranged before. So that the old production schedule have to revised by reschedulling. The procedure that be used to schedule the real time production consist of n job m machine is algoritm of Hueristik Dispatching Rule Shorted Processing Time (SPT) method to minimize mean tardiness and makespan.http://ejournal.umm.ac.id/index.php/industri/article/view/240Production SystemSchedulling and Reschedulling SPTMakespanUMM
spellingShingle Eti Kristinawati
Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
Jurnal Teknik Industri
Production System
Schedulling and Reschedulling SPT
Makespan
UMM
title Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
title_full Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
title_fullStr Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
title_full_unstemmed Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
title_short Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
title_sort perencanaan scheduling dan rescheduling dengan metode heuristic spt guna meminimumkan mean tardiness dan makespan
topic Production System
Schedulling and Reschedulling SPT
Makespan
UMM
url http://ejournal.umm.ac.id/index.php/industri/article/view/240
work_keys_str_mv AT etikristinawati perencanaanschedulingdanreschedulingdenganmetodeheuristicsptgunameminimumkanmeantardinessdanmakespan