Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
To complete customer's demand so company must make a plan with using production schedule. Some diffrculties usually happen in shop floor level is a new job which is put in a production schedule that have arranged before. So that the old production schedule have to revised by reschedulling. The...
Main Author: | Eti Kristinawati |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2010-04-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/240 |
Similar Items
-
Perencanaan Jadwal Induk Produksi Dengan Menggunakan Metode Disagregat Guna Memenuhi Permintaan Yang Berfluktuasi
by: Eti Kristinawati
Published: (2010-04-01) -
Penjadualan Produksi n job m mesin Untuk Sistem Produksi Job Shop di Perusahaan dan Industri Mesin Aneka Mesin Malang
by: Moh. Hartono
Published: (2010-05-01) -
PENJADWALAN NON-DELAY MELALUI MESIN MAJEMUK UNTUK MEMINIMUMKAN MAKESPAN
by: Johan Oscar Ong
Published: (2013-10-01) -
Job shop scheduling with makespan objective: A heuristic approach
by: Mohsen Ziaee
Published: (2014-04-01) -
Penjadwalan Produksi dengan Metode Johnson dan Heuristic untuk Meminimasi Makespan, Total Flow Time, serta Idle Time
by: Dyah Retno Purwatiningsih, et al.
Published: (2010-05-01)