Performance Evaluation of TBM Using an Improved Load Prediction Model
Excavation load prediction is of great importance for the prior design and latter performance evaluation of tunnel boring machines (TBMs). In this paper, an improved load prediction model is developed based on classical Colorado school of mines model for TBMs equipped with constant cross-sectional d...
Main Authors: | Xinghai Zhou, Guofang Gong, Yakun Zhang, Weiqiang Wu, Yuxi Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-01-01
|
Series: | Machines |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-1702/11/2/141 |
Similar Items
-
A Novel Method of Laser Coating Process on Worn-Out Cutter Rings of Tunnel Boring Machine for Eco-Friendly Reuse
by: Anil Kumar Agrawal, et al.
Published: (2020-03-01) -
Digital Twin-Driven Framework for TBM Performance Prediction, Visualization, and Monitoring through Machine Learning
by: Kamran Latif, et al.
Published: (2023-10-01) -
Disc Bit Abrasion Parameters in TBM Tunnelling regarded exemplarily for the Gotthard Base Tunnel
by: Edmund a Wax, et al.
Published: (2005-11-01) -
Coal Rock Breaking Simulation and Cutting Performance Analysis of Disc Cutters
by: Xu Zhang*, et al.
Published: (2021-01-01) -
Application of response surface method to the prediction of TBM penetration rate
by: Mojtaba Mokhtarian Asl, et al.
Published: (2018-12-01)