CBS (Contrastrain Based Schedulling) adalah Faktor Penentu Keberhasilan Perusahanan Printing
In a highly competitive industry faces today ranging from small or home-based printing to using machine that can print offset a hundred thousand copies per hour. But, the increasing competition resulted in requiring a faster production time from order entry, print proff until the production process...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Bina Nusantara University
2010-06-01
|
Series: | ComTech |
Subjects: | |
Online Access: | https://journal.binus.ac.id/index.php/comtech/article/view/2169 |
_version_ | 1797756911575105536 |
---|---|
author | Hendra Achmadi |
author_facet | Hendra Achmadi |
author_sort | Hendra Achmadi |
collection | DOAJ |
description | In a highly competitive industry faces today ranging from small or home-based printing to using machine that can print offset a hundred thousand copies per hour. But, the increasing competition resulted in requiring a faster production time from order entry, print proff until the production process to delivery to customers. Often times in case of orders which will result in the concurrent PPIC will experience vertigo in the setting of production schedules which have concurrent delivery time. Often will end up with no receipt of orders due to difficulties in the production schedule, especially if the orders require the same offset machine and cylinder wear the same length, while the number of cylinders is limited. Therefore, the printing company should be able to do so in the conduct of a penetration timing of production can easily be simulated and implemented on the ground. CBS (Base Constraint scheduling) is a technique to do the scheduling of production so that production can be carried out smoothly and quickly that fulfill the promise made to customers. In scheduling, there are several techniques that can be used are: FCFS (First Came First Serve), EDD (Earliest Date), and LCLS (Last Came Last Serve). So, it is required to be able to do way better scheduling to get results quickly in this fast changing schedules. |
first_indexed | 2024-03-12T18:08:21Z |
format | Article |
id | doaj.art-64442e7932e14a0c88ed948b5141248e |
institution | Directory Open Access Journal |
issn | 2087-1244 2476-907X |
language | English |
last_indexed | 2024-03-12T18:08:21Z |
publishDate | 2010-06-01 |
publisher | Bina Nusantara University |
record_format | Article |
series | ComTech |
spelling | doaj.art-64442e7932e14a0c88ed948b5141248e2023-08-02T09:20:59ZengBina Nusantara UniversityComTech2087-12442476-907X2010-06-0111758710.21512/comtech.v1i1.21691581CBS (Contrastrain Based Schedulling) adalah Faktor Penentu Keberhasilan Perusahanan PrintingHendra Achmadi0Bina Nusantara UniversityIn a highly competitive industry faces today ranging from small or home-based printing to using machine that can print offset a hundred thousand copies per hour. But, the increasing competition resulted in requiring a faster production time from order entry, print proff until the production process to delivery to customers. Often times in case of orders which will result in the concurrent PPIC will experience vertigo in the setting of production schedules which have concurrent delivery time. Often will end up with no receipt of orders due to difficulties in the production schedule, especially if the orders require the same offset machine and cylinder wear the same length, while the number of cylinders is limited. Therefore, the printing company should be able to do so in the conduct of a penetration timing of production can easily be simulated and implemented on the ground. CBS (Base Constraint scheduling) is a technique to do the scheduling of production so that production can be carried out smoothly and quickly that fulfill the promise made to customers. In scheduling, there are several techniques that can be used are: FCFS (First Came First Serve), EDD (Earliest Date), and LCLS (Last Came Last Serve). So, it is required to be able to do way better scheduling to get results quickly in this fast changing schedules.https://journal.binus.ac.id/index.php/comtech/article/view/2169CBS, production scheduling techniques, printing company |
spellingShingle | Hendra Achmadi CBS (Contrastrain Based Schedulling) adalah Faktor Penentu Keberhasilan Perusahanan Printing ComTech CBS, production scheduling techniques, printing company |
title | CBS (Contrastrain Based Schedulling) adalah Faktor Penentu Keberhasilan Perusahanan Printing |
title_full | CBS (Contrastrain Based Schedulling) adalah Faktor Penentu Keberhasilan Perusahanan Printing |
title_fullStr | CBS (Contrastrain Based Schedulling) adalah Faktor Penentu Keberhasilan Perusahanan Printing |
title_full_unstemmed | CBS (Contrastrain Based Schedulling) adalah Faktor Penentu Keberhasilan Perusahanan Printing |
title_short | CBS (Contrastrain Based Schedulling) adalah Faktor Penentu Keberhasilan Perusahanan Printing |
title_sort | cbs contrastrain based schedulling adalah faktor penentu keberhasilan perusahanan printing |
topic | CBS, production scheduling techniques, printing company |
url | https://journal.binus.ac.id/index.php/comtech/article/view/2169 |
work_keys_str_mv | AT hendraachmadi cbscontrastrainbasedschedullingadalahfaktorpenentukeberhasilanperusahananprinting |