Bankability challenges for the construction of micro hydro power plants utilizing state-owned dams (case study: Pandanduri dam, West Nusa Tenggara-Indonesia)
Power supply business plan (RUPTL) of PT. PLN (Persero) year 2021-2030 states that there is an electric potential of 337.1 MW that can be generated from 60 dams owned by the Government of the Republic of Indonesia through the Ministry of Public Works and Public Housing. The tender process for severa...
Main Authors: | Pangarso Suksmo Satriyo, Alexando Bryan, Aminata Jaka |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2023-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/105/e3sconf_icstugm2023_10001.pdf |
Similar Items
-
OPTIMASI PEMANFAATAN SUMBERDAYA AIR
WADUK PANDANDURI DI LOMBOK TIMUR NUSA TENGGARA BARAT
by: , Abdul Aziz, et al.
Published: (2012) -
PENGEMBANGAN MODEL OPTIMASI WADUK PANDANDURI UNTUK PEMENUHAN KEBUTUHAN AIR IRIGASI DI LOMBOK TIMUR NUSA TENGGARA BARAT
by: , Ratih Kusuma Hartini, et al.
Published: (2013) -
Slope stability analysis of the drainage tunnel portal in Tanju Dam, Dompu District, West Nusa Tenggara
by: Dinata Edden Umaga, et al.
Published: (2021-01-01) -
Assessment of groundwater leakage source using hydrochemical data and isotopes in the Pandanduri dam tunnel, Lombok Island, Indonesia
by: Hendrayana, Heru, et al.
Published: (2022) -
Assessment of groundwater leakage source using hydrochemical data and isotopes in the Pandanduri dam tunnel, Lombok Island, Indonesia
by: Heru Hendrayana, et al.
Published: (2022-10-01)