Design and operation of the air-cooled beam dump for the extraction line of CERN’s proton synchrotron booster
A new beam dump has been designed, built, installed and operated to withstand the future proton beam extracted from the proton synchrotron booster (PSB) in the framework of the LHC Injector Upgrade (LIU) Project at CERN. The future proton beam consists of up to 1×10^{14} protons per pulse at 2 GeV a...
Main Authors: | A. Perillo-Marcone, M. Calviani, N. Solieri, A. Ciccotelli, P. Kaiser, A. Sarrio, V. Venturi, V. Vlachoudis |
---|---|
Format: | Article |
Language: | English |
Published: |
American Physical Society
2020-06-01
|
Series: | Physical Review Accelerators and Beams |
Online Access: | http://doi.org/10.1103/PhysRevAccelBeams.23.063001 |
Similar Items
-
Hot isostatic pressing assisted diffusion bonding for application to the Super Proton Synchrotron internal beam dump at CERN
by: S. Pianese, et al.
Published: (2021-04-01) -
Source of horizontal instability at the CERN Proton Synchrotron Booster
by: E. Koukovini-Platia, et al.
Published: (2019-12-01) -
Design of a high power production target for the beam dump facility at CERN
by: E. Lopez Sola, et al.
Published: (2019-11-01) -
Transverse beam coupling impedance of the CERN Proton Synchrotron
by: S. Persichelli, et al.
Published: (2016-04-01) -
CERN antiproton target: Hydrocode analysis of its core material dynamic response under proton beam impact
by: Claudio Torregrosa Martin, et al.
Published: (2016-07-01)