Geotechnical Assessment of the Erbil-Hareer Highway in North Iraq, Kurdistan Region, Using a Field Method
A new highway is under construction since few years to join the capital; Erbil city with many main towns connecting; in the plan to the northern boarders of the Iraqi Kurdistan Region. It is a double lane road constructed according to modern standards. It crosses many mountains, and two tun...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Union of Iraqi Geologists (UIG)
2022-04-01
|
Series: | Iraqi Geological Journal |
Online Access: | https://igj-iraq.org/igj/index.php/igj/article/view/725 |
_version_ | 1818138889479520256 |
---|---|
author | Varoujan K. Sissakian Mohammed J. Hamwandy Rahel Kh. Ibrahi |
author_facet | Varoujan K. Sissakian Mohammed J. Hamwandy Rahel Kh. Ibrahi |
author_sort | Varoujan K. Sissakian |
collection | DOAJ |
description | A new highway is under construction since few years to join the capital; Erbil city with many main towns connecting; in the plan to the northern boarders of the Iraqi Kurdistan Region. It is a double lane road constructed according to modern standards. It crosses many mountains, and two tunnels are already completed, one is almost completed and another one is abandoned: hitherto. The completed part of the highway reaches the Hareer town with some parts being under construction before and after the Shaqlawa town. Because parts of the Highway are not completed yet; therefore, those parts suffer from slope stability problems; mainly due to the drainage problems. Other completed parts; however, suffer also from slope stability problems; mainly due to steep slope road cuts and/ or irrelevant treatments for the road cuts. Among those unstable slopes, we have chosen six stations, which experienced the most severe failures. At those six stations, we have applied field method to estimate the possibility of failure following Bejerman’s method. We have found that the failure possibility is high in the station Nos. 1- 4, and is Low in the station Nos. 5 and 6. |
first_indexed | 2024-12-11T10:19:22Z |
format | Article |
id | doaj.art-6478acfb8640481f9966a2832d8601a0 |
institution | Directory Open Access Journal |
issn | 2414-6064 2663-8754 |
language | English |
last_indexed | 2024-12-11T10:19:22Z |
publishDate | 2022-04-01 |
publisher | Union of Iraqi Geologists (UIG) |
record_format | Article |
series | Iraqi Geological Journal |
spelling | doaj.art-6478acfb8640481f9966a2832d8601a02022-12-22T01:11:30ZengUnion of Iraqi Geologists (UIG)Iraqi Geological Journal2414-60642663-87542022-04-01551D13014010.46717/igj.55.1D.9Ms-2022-04-25Geotechnical Assessment of the Erbil-Hareer Highway in North Iraq, Kurdistan Region, Using a Field MethodVaroujan K. SissakianMohammed J. HamwandyRahel Kh. Ibrahi A new highway is under construction since few years to join the capital; Erbil city with many main towns connecting; in the plan to the northern boarders of the Iraqi Kurdistan Region. It is a double lane road constructed according to modern standards. It crosses many mountains, and two tunnels are already completed, one is almost completed and another one is abandoned: hitherto. The completed part of the highway reaches the Hareer town with some parts being under construction before and after the Shaqlawa town. Because parts of the Highway are not completed yet; therefore, those parts suffer from slope stability problems; mainly due to the drainage problems. Other completed parts; however, suffer also from slope stability problems; mainly due to steep slope road cuts and/ or irrelevant treatments for the road cuts. Among those unstable slopes, we have chosen six stations, which experienced the most severe failures. At those six stations, we have applied field method to estimate the possibility of failure following Bejerman’s method. We have found that the failure possibility is high in the station Nos. 1- 4, and is Low in the station Nos. 5 and 6.https://igj-iraq.org/igj/index.php/igj/article/view/725 |
spellingShingle | Varoujan K. Sissakian Mohammed J. Hamwandy Rahel Kh. Ibrahi Geotechnical Assessment of the Erbil-Hareer Highway in North Iraq, Kurdistan Region, Using a Field Method Iraqi Geological Journal |
title | Geotechnical Assessment of the Erbil-Hareer Highway in North Iraq, Kurdistan Region, Using a Field Method |
title_full | Geotechnical Assessment of the Erbil-Hareer Highway in North Iraq, Kurdistan Region, Using a Field Method |
title_fullStr | Geotechnical Assessment of the Erbil-Hareer Highway in North Iraq, Kurdistan Region, Using a Field Method |
title_full_unstemmed | Geotechnical Assessment of the Erbil-Hareer Highway in North Iraq, Kurdistan Region, Using a Field Method |
title_short | Geotechnical Assessment of the Erbil-Hareer Highway in North Iraq, Kurdistan Region, Using a Field Method |
title_sort | geotechnical assessment of the erbil hareer highway in north iraq kurdistan region using a field method |
url | https://igj-iraq.org/igj/index.php/igj/article/view/725 |
work_keys_str_mv | AT varoujanksissakian geotechnicalassessmentoftheerbilhareerhighwayinnorthiraqkurdistanregionusingafieldmethod AT mohammedjhamwandy geotechnicalassessmentoftheerbilhareerhighwayinnorthiraqkurdistanregionusingafieldmethod AT rahelkhibrahi geotechnicalassessmentoftheerbilhareerhighwayinnorthiraqkurdistanregionusingafieldmethod |