Economics of a hydraulic hammer for forest road construction in a mountainous area

This research deals with productivity and cost of rock disintegration and side casting of materials with the use of a hydraulic hammer mounted on a PC 220 Komatsu crawler excavator, which is used on rocky slopes of Hyrcanian forests of Iran. A continuing time study was applied during the road constr...

Full description

Bibliographic Details
Main Authors: A. Parsakhoo, S. A. Hosseini, M. R. Ghaffariyan
Format: Article
Language:English
Published: Czech Academy of Agricultural Sciences 2011-12-01
Series:Journal of Forest Science
Subjects:
Online Access:https://jfs.agriculturejournals.cz/artkey/jfs-201112-0006_economics-of-a-hydraulic-hammer-for-forest-road-construction-in-a-mountainous-area.php
_version_ 1797898844306931712
author A. Parsakhoo
S. A. Hosseini
M. R. Ghaffariyan
author_facet A. Parsakhoo
S. A. Hosseini
M. R. Ghaffariyan
author_sort A. Parsakhoo
collection DOAJ
description This research deals with productivity and cost of rock disintegration and side casting of materials with the use of a hydraulic hammer mounted on a PC 220 Komatsu crawler excavator, which is used on rocky slopes of Hyrcanian forests of Iran. A continuing time study was applied during the road construction. To estimate the volume of rock disintegration, the average end area equation was used. The increasing cut-slope height decreased productivity. The productivity of hydraulic hammer averaged at 5.5 m3.h-1 for the mean work volume of 5.07 m3.m-1. The unit cost of the system was 7.7 €.m-3. From the economic point of view a new machine with multipurpose system could be recommended for forest road construction operations in rocky areas.
first_indexed 2024-04-10T08:19:28Z
format Article
id doaj.art-64afe9fc9ad240fead897d8ab526e8de
institution Directory Open Access Journal
issn 1212-4834
1805-935X
language English
last_indexed 2024-04-10T08:19:28Z
publishDate 2011-12-01
publisher Czech Academy of Agricultural Sciences
record_format Article
series Journal of Forest Science
spelling doaj.art-64afe9fc9ad240fead897d8ab526e8de2023-02-23T03:42:16ZengCzech Academy of Agricultural SciencesJournal of Forest Science1212-48341805-935X2011-12-01571256557310.17221/59/2011-JFSjfs-201112-0006Economics of a hydraulic hammer for forest road construction in a mountainous areaA. Parsakhoo0S. A. Hosseini1M. R. Ghaffariyan2Department of Forestry, Faculty of Natural Resources, Sari Agricultural Sciences and Natural Resources University, Sari, IranDepartment of Forestry, Faculty of Natural Resources, Sari Agricultural Sciences and Natural Resources University, Sari, IranResearch Fellow, Harvesting and Operations, CRC Forestry, University of Tasmania, AustraliaThis research deals with productivity and cost of rock disintegration and side casting of materials with the use of a hydraulic hammer mounted on a PC 220 Komatsu crawler excavator, which is used on rocky slopes of Hyrcanian forests of Iran. A continuing time study was applied during the road construction. To estimate the volume of rock disintegration, the average end area equation was used. The increasing cut-slope height decreased productivity. The productivity of hydraulic hammer averaged at 5.5 m3.h-1 for the mean work volume of 5.07 m3.m-1. The unit cost of the system was 7.7 €.m-3. From the economic point of view a new machine with multipurpose system could be recommended for forest road construction operations in rocky areas.https://jfs.agriculturejournals.cz/artkey/jfs-201112-0006_economics-of-a-hydraulic-hammer-for-forest-road-construction-in-a-mountainous-area.phphydraulic hammerrock disintegrationcut slopeproductivitycosts
spellingShingle A. Parsakhoo
S. A. Hosseini
M. R. Ghaffariyan
Economics of a hydraulic hammer for forest road construction in a mountainous area
Journal of Forest Science
hydraulic hammer
rock disintegration
cut slope
productivity
costs
title Economics of a hydraulic hammer for forest road construction in a mountainous area
title_full Economics of a hydraulic hammer for forest road construction in a mountainous area
title_fullStr Economics of a hydraulic hammer for forest road construction in a mountainous area
title_full_unstemmed Economics of a hydraulic hammer for forest road construction in a mountainous area
title_short Economics of a hydraulic hammer for forest road construction in a mountainous area
title_sort economics of a hydraulic hammer for forest road construction in a mountainous area
topic hydraulic hammer
rock disintegration
cut slope
productivity
costs
url https://jfs.agriculturejournals.cz/artkey/jfs-201112-0006_economics-of-a-hydraulic-hammer-for-forest-road-construction-in-a-mountainous-area.php
work_keys_str_mv AT aparsakhoo economicsofahydraulichammerforforestroadconstructioninamountainousarea
AT sahosseini economicsofahydraulichammerforforestroadconstructioninamountainousarea
AT mrghaffariyan economicsofahydraulichammerforforestroadconstructioninamountainousarea