Coordinated Production Planning and Scheduling Problem in a Foundry

In the paper, we present a coordinated production planning and scheduling problem for three major shops in a typical alloy casting foundry, i.e. a melting shop, molding shop with automatic line and a core shop. The castings, prepared from different metal, have different weight and different number o...

Full description

Bibliographic Details
Main Authors: Stawowy A., Duda J.
Format: Article
Language:English
Published: Polish Academy of Sciences 2017-09-01
Series:Archives of Foundry Engineering
Subjects:
Online Access:http://www.degruyter.com/view/j/afe.2017.17.issue-3/afe-2017-0105/afe-2017-0105.xml?format=INT
_version_ 1797762941592797184
author Stawowy A.
Duda J.
author_facet Stawowy A.
Duda J.
author_sort Stawowy A.
collection DOAJ
description In the paper, we present a coordinated production planning and scheduling problem for three major shops in a typical alloy casting foundry, i.e. a melting shop, molding shop with automatic line and a core shop. The castings, prepared from different metal, have different weight and different number of cores. Although core preparation does not required as strict coordination with molding plan as metal preparation in furnaces, some cores may have limited shelf life, depending on the material used, or at least it is usually not the best organizational practice to prepare them long in advance. Core shop have limited capacity, so the cores for castings that require multiple cores should be prepared earlier. We present a mixed integer programming model for the coordinated production planning and scheduling problem of the shops. Then we propose a simple Lagrangian relaxation heuristic and evolutionary based heuristic to solve the coordinated problem. The applicability of the proposed solution in industrial practice is verified on large instances of the problem with the data simulating actual production parameters in one of the medium size foundry.
first_indexed 2024-03-12T19:34:29Z
format Article
id doaj.art-66a5938bad304693ab646b12c5884a44
institution Directory Open Access Journal
issn 2299-2944
language English
last_indexed 2024-03-12T19:34:29Z
publishDate 2017-09-01
publisher Polish Academy of Sciences
record_format Article
series Archives of Foundry Engineering
spelling doaj.art-66a5938bad304693ab646b12c5884a442023-08-02T04:15:04ZengPolish Academy of SciencesArchives of Foundry Engineering2299-29442017-09-0117313313810.1515/afe-2017-0105afe-2017-0105Coordinated Production Planning and Scheduling Problem in a FoundryStawowy A.0Duda J.1AGH University of Science and Technology, Faculty of Management, ul. Gramatyka 10, 30-067Kraków, PolandAGH University of Science and Technology, Faculty of Management, ul. Gramatyka 10, 30-067Kraków, PolandIn the paper, we present a coordinated production planning and scheduling problem for three major shops in a typical alloy casting foundry, i.e. a melting shop, molding shop with automatic line and a core shop. The castings, prepared from different metal, have different weight and different number of cores. Although core preparation does not required as strict coordination with molding plan as metal preparation in furnaces, some cores may have limited shelf life, depending on the material used, or at least it is usually not the best organizational practice to prepare them long in advance. Core shop have limited capacity, so the cores for castings that require multiple cores should be prepared earlier. We present a mixed integer programming model for the coordinated production planning and scheduling problem of the shops. Then we propose a simple Lagrangian relaxation heuristic and evolutionary based heuristic to solve the coordinated problem. The applicability of the proposed solution in industrial practice is verified on large instances of the problem with the data simulating actual production parameters in one of the medium size foundry.http://www.degruyter.com/view/j/afe.2017.17.issue-3/afe-2017-0105/afe-2017-0105.xml?format=INTHeuristicsApplication of information technology to the foundry industryMixed integer programmingProduction planningScheduling
spellingShingle Stawowy A.
Duda J.
Coordinated Production Planning and Scheduling Problem in a Foundry
Archives of Foundry Engineering
Heuristics
Application of information technology to the foundry industry
Mixed integer programming
Production planning
Scheduling
title Coordinated Production Planning and Scheduling Problem in a Foundry
title_full Coordinated Production Planning and Scheduling Problem in a Foundry
title_fullStr Coordinated Production Planning and Scheduling Problem in a Foundry
title_full_unstemmed Coordinated Production Planning and Scheduling Problem in a Foundry
title_short Coordinated Production Planning and Scheduling Problem in a Foundry
title_sort coordinated production planning and scheduling problem in a foundry
topic Heuristics
Application of information technology to the foundry industry
Mixed integer programming
Production planning
Scheduling
url http://www.degruyter.com/view/j/afe.2017.17.issue-3/afe-2017-0105/afe-2017-0105.xml?format=INT
work_keys_str_mv AT stawowya coordinatedproductionplanningandschedulingprobleminafoundry
AT dudaj coordinatedproductionplanningandschedulingprobleminafoundry