Coordinated Production Planning and Scheduling Problem in a Foundry
In the paper, we present a coordinated production planning and scheduling problem for three major shops in a typical alloy casting foundry, i.e. a melting shop, molding shop with automatic line and a core shop. The castings, prepared from different metal, have different weight and different number o...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2017-09-01
|
Series: | Archives of Foundry Engineering |
Subjects: | |
Online Access: | http://www.degruyter.com/view/j/afe.2017.17.issue-3/afe-2017-0105/afe-2017-0105.xml?format=INT |
_version_ | 1797762941592797184 |
---|---|
author | Stawowy A. Duda J. |
author_facet | Stawowy A. Duda J. |
author_sort | Stawowy A. |
collection | DOAJ |
description | In the paper, we present a coordinated production planning and scheduling problem for three major shops in a typical alloy casting foundry, i.e. a melting shop, molding shop with automatic line and a core shop. The castings, prepared from different metal, have different weight and different number of cores. Although core preparation does not required as strict coordination with molding plan as metal preparation in furnaces, some cores may have limited shelf life, depending on the material used, or at least it is usually not the best organizational practice to prepare them long in advance. Core shop have limited capacity, so the cores for castings that require multiple cores should be prepared earlier. We present a mixed integer programming model for the coordinated production planning and scheduling problem of the shops. Then we propose a simple Lagrangian relaxation heuristic and evolutionary based heuristic to solve the coordinated problem. The applicability of the proposed solution in industrial practice is verified on large instances of the problem with the data simulating actual production parameters in one of the medium size foundry. |
first_indexed | 2024-03-12T19:34:29Z |
format | Article |
id | doaj.art-66a5938bad304693ab646b12c5884a44 |
institution | Directory Open Access Journal |
issn | 2299-2944 |
language | English |
last_indexed | 2024-03-12T19:34:29Z |
publishDate | 2017-09-01 |
publisher | Polish Academy of Sciences |
record_format | Article |
series | Archives of Foundry Engineering |
spelling | doaj.art-66a5938bad304693ab646b12c5884a442023-08-02T04:15:04ZengPolish Academy of SciencesArchives of Foundry Engineering2299-29442017-09-0117313313810.1515/afe-2017-0105afe-2017-0105Coordinated Production Planning and Scheduling Problem in a FoundryStawowy A.0Duda J.1AGH University of Science and Technology, Faculty of Management, ul. Gramatyka 10, 30-067Kraków, PolandAGH University of Science and Technology, Faculty of Management, ul. Gramatyka 10, 30-067Kraków, PolandIn the paper, we present a coordinated production planning and scheduling problem for three major shops in a typical alloy casting foundry, i.e. a melting shop, molding shop with automatic line and a core shop. The castings, prepared from different metal, have different weight and different number of cores. Although core preparation does not required as strict coordination with molding plan as metal preparation in furnaces, some cores may have limited shelf life, depending on the material used, or at least it is usually not the best organizational practice to prepare them long in advance. Core shop have limited capacity, so the cores for castings that require multiple cores should be prepared earlier. We present a mixed integer programming model for the coordinated production planning and scheduling problem of the shops. Then we propose a simple Lagrangian relaxation heuristic and evolutionary based heuristic to solve the coordinated problem. The applicability of the proposed solution in industrial practice is verified on large instances of the problem with the data simulating actual production parameters in one of the medium size foundry.http://www.degruyter.com/view/j/afe.2017.17.issue-3/afe-2017-0105/afe-2017-0105.xml?format=INTHeuristicsApplication of information technology to the foundry industryMixed integer programmingProduction planningScheduling |
spellingShingle | Stawowy A. Duda J. Coordinated Production Planning and Scheduling Problem in a Foundry Archives of Foundry Engineering Heuristics Application of information technology to the foundry industry Mixed integer programming Production planning Scheduling |
title | Coordinated Production Planning and Scheduling Problem in a Foundry |
title_full | Coordinated Production Planning and Scheduling Problem in a Foundry |
title_fullStr | Coordinated Production Planning and Scheduling Problem in a Foundry |
title_full_unstemmed | Coordinated Production Planning and Scheduling Problem in a Foundry |
title_short | Coordinated Production Planning and Scheduling Problem in a Foundry |
title_sort | coordinated production planning and scheduling problem in a foundry |
topic | Heuristics Application of information technology to the foundry industry Mixed integer programming Production planning Scheduling |
url | http://www.degruyter.com/view/j/afe.2017.17.issue-3/afe-2017-0105/afe-2017-0105.xml?format=INT |
work_keys_str_mv | AT stawowya coordinatedproductionplanningandschedulingprobleminafoundry AT dudaj coordinatedproductionplanningandschedulingprobleminafoundry |