Coordinated Production Planning and Scheduling Problem in a Foundry
In the paper, we present a coordinated production planning and scheduling problem for three major shops in a typical alloy casting foundry, i.e. a melting shop, molding shop with automatic line and a core shop. The castings, prepared from different metal, have different weight and different number o...
Main Authors: | Stawowy A., Duda J. |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2017-09-01
|
Series: | Archives of Foundry Engineering |
Subjects: | |
Online Access: | http://www.degruyter.com/view/j/afe.2017.17.issue-3/afe-2017-0105/afe-2017-0105.xml?format=INT |
Similar Items
-
Iterated Local Search for Foundry Lotsizing and Scheduling Problem with Setup Costs
by: Stawowy A., et al.
Published: (2017-12-01) -
Mathematical Programming for Lot Sizing and Production Scheduling in Foundries
by: Duda J., et al.
Published: (2014-08-01) -
Application of Interval Arithmetic to Production Planning in a Foundry
by: Duda J., et al.
Published: (2017-03-01) -
Production Scheduling under Fuzziness for the Furnace - Casting Line System
by: Duda J., et al.
Published: (2015-12-01) -
Applicability of Business Rules to Production Management in Foundries
by: Stawowy A., et al.
Published: (2016-03-01)