FLOW SHOP SCHEDULING BASED ON PALMER-NEH, GUPTA-NEH AND DANNENBRING-NEH ALGORITHMS TO MINIMIZE THE ENERGY COST
In the manufacturing industry, the most widely used equipment is equipment that uses electricity. Electricity cost is one of the highest operational production costs after labor cost. So, it is very important to save and optimize the use of electrical equipment. One of the manufacturing industries i...
Main Authors: | Masrikhan Masrikhan, Dwi Agustina Kurniawati |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Mercu Buana
2021-01-01
|
Series: | Jurnal Ilmiah SINERGI |
Subjects: | |
Online Access: | https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/8126 |
Similar Items
-
Two NEH Heuristic Improvements for Flowshop Scheduling Problem with Makespan Criterion
by: Christophe Sauvey, et al.
Published: (2020-04-01) -
Genetic diversity and relationship among North East Hill (NEH) goats
by: PUSHP RAJ SHIVAHRE, et al.
Published: (2019-12-01) -
MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
by: Hendy Tannady
Published: (2013-06-01) -
Evaluating procedures in the NEH heuristic for the PFSP - SIST
by: Clarissa Tararam de Laurentys, et al.
Published: (2024-01-01) -
Modified Neh Heuristic On Makespan Reduction In Permutation Flow Shop Problems
by: Chong, Zheng Ziao
Published: (2015)