Number of Machine and Material Requirements for Production Planning of Tablet Tooling with the Demand of 200 Units/Day
Shaping and marketing a product in tablet form is an easy and economical alternative to product shaping. Products in tablet form now cover almost all fields, so that the demand for tablet tooling of various sizes and variations continues to increase. As an effort to support the effectiveness and pro...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Yayasan Pendidikan Riset dan Pengembangan Intelektual (YRPI)
2021-05-01
|
Series: | Journal of Applied Engineering and Technological Science |
Subjects: | |
Online Access: | https://journal.yrpipku.com/index.php/jaets/article/view/209 |
_version_ | 1828942118179045376 |
---|---|
author | Nanang Qosim Andre Kurniawan Moh. Nasir Hariyanto Zakki F. Emzain Moh. Hartono AM Mufarrih |
author_facet | Nanang Qosim Andre Kurniawan Moh. Nasir Hariyanto Zakki F. Emzain Moh. Hartono AM Mufarrih |
author_sort | Nanang Qosim |
collection | DOAJ |
description | Shaping and marketing a product in tablet form is an easy and economical alternative to product shaping. Products in tablet form now cover almost all fields, so that the demand for tablet tooling of various sizes and variations continues to increase. As an effort to support the effectiveness and proper industrial planning, it is necessary to carry out an analysis of the machine and material requirements to produce tablet tooling which is the aim of this study. To achieve these objectives, the methods used in this study include product design, operation plan analysis, and calculation of material requirements and number of machines. The result shows that the number of machine requirements to manufacture the die and punch of tablet tooling with the demand of 200 unit/day are two units of power hacksaw, five units of lathe machine, and a unit of milling machine. On the other hand, the material requirements needed in one day are 22.24 m (Ø45 mm x 5 bars) and 12.79 m (Ø18 mm x 3 bars). |
first_indexed | 2024-12-14T03:49:12Z |
format | Article |
id | doaj.art-6769ddc89b1e468b9940230fe447c0f2 |
institution | Directory Open Access Journal |
issn | 2715-6087 2715-6079 |
language | English |
last_indexed | 2024-12-14T03:49:12Z |
publishDate | 2021-05-01 |
publisher | Yayasan Pendidikan Riset dan Pengembangan Intelektual (YRPI) |
record_format | Article |
series | Journal of Applied Engineering and Technological Science |
spelling | doaj.art-6769ddc89b1e468b9940230fe447c0f22022-12-21T23:18:16ZengYayasan Pendidikan Riset dan Pengembangan Intelektual (YRPI)Journal of Applied Engineering and Technological Science2715-60872715-60792021-05-012210.37385/jaets.v2i2.209Number of Machine and Material Requirements for Production Planning of Tablet Tooling with the Demand of 200 Units/DayNanang Qosim0Andre Kurniawan1Moh. Nasir Hariyanto2Zakki F. Emzain3Moh. Hartono4AM Mufarrih5Politeknik Negeri MalangUniversitas Negeri PadangPoliteknik Negeri MalangPoliteknik Negeri MalangPoliteknik Negeri MalangPoliteknik Negeri MalangShaping and marketing a product in tablet form is an easy and economical alternative to product shaping. Products in tablet form now cover almost all fields, so that the demand for tablet tooling of various sizes and variations continues to increase. As an effort to support the effectiveness and proper industrial planning, it is necessary to carry out an analysis of the machine and material requirements to produce tablet tooling which is the aim of this study. To achieve these objectives, the methods used in this study include product design, operation plan analysis, and calculation of material requirements and number of machines. The result shows that the number of machine requirements to manufacture the die and punch of tablet tooling with the demand of 200 unit/day are two units of power hacksaw, five units of lathe machine, and a unit of milling machine. On the other hand, the material requirements needed in one day are 22.24 m (Ø45 mm x 5 bars) and 12.79 m (Ø18 mm x 3 bars).https://journal.yrpipku.com/index.php/jaets/article/view/209tablet tooling, number of machines, need of materials, die and punch, demand |
spellingShingle | Nanang Qosim Andre Kurniawan Moh. Nasir Hariyanto Zakki F. Emzain Moh. Hartono AM Mufarrih Number of Machine and Material Requirements for Production Planning of Tablet Tooling with the Demand of 200 Units/Day Journal of Applied Engineering and Technological Science tablet tooling, number of machines, need of materials, die and punch, demand |
title | Number of Machine and Material Requirements for Production Planning of Tablet Tooling with the Demand of 200 Units/Day |
title_full | Number of Machine and Material Requirements for Production Planning of Tablet Tooling with the Demand of 200 Units/Day |
title_fullStr | Number of Machine and Material Requirements for Production Planning of Tablet Tooling with the Demand of 200 Units/Day |
title_full_unstemmed | Number of Machine and Material Requirements for Production Planning of Tablet Tooling with the Demand of 200 Units/Day |
title_short | Number of Machine and Material Requirements for Production Planning of Tablet Tooling with the Demand of 200 Units/Day |
title_sort | number of machine and material requirements for production planning of tablet tooling with the demand of 200 units day |
topic | tablet tooling, number of machines, need of materials, die and punch, demand |
url | https://journal.yrpipku.com/index.php/jaets/article/view/209 |
work_keys_str_mv | AT nanangqosim numberofmachineandmaterialrequirementsforproductionplanningoftablettoolingwiththedemandof200unitsday AT andrekurniawan numberofmachineandmaterialrequirementsforproductionplanningoftablettoolingwiththedemandof200unitsday AT mohnasirhariyanto numberofmachineandmaterialrequirementsforproductionplanningoftablettoolingwiththedemandof200unitsday AT zakkifemzain numberofmachineandmaterialrequirementsforproductionplanningoftablettoolingwiththedemandof200unitsday AT mohhartono numberofmachineandmaterialrequirementsforproductionplanningoftablettoolingwiththedemandof200unitsday AT ammufarrih numberofmachineandmaterialrequirementsforproductionplanningoftablettoolingwiththedemandof200unitsday |