A Review of the Transient Process and Control for a Hydropower Station with a Super Long Headrace Tunnel
The hydropower station with a super long headrace tunnel is a significant development type for hydropower energy. By constructing a super long headrace tunnel, the huge natural water fall head can be utilized to generate more electricity. With the development of hydropower energy, a hydropower stati...
Main Authors: | Wencheng Guo, Daoyi Zhu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-11-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/11/11/2994 |
Similar Items
-
Investigation of design criteria for Maron hydropower tunnels of ehbahan
by: Sadegh Haghighipour, et al.
Published: (2009-06-01) -
A Review of the Hydraulic Transient and Dynamic Behavior of Hydropower Plants with Sloping Ceiling Tailrace Tunnels
by: Wencheng Guo
Published: (2019-08-01) -
A Review of Critical Stable Sectional Areas for the Surge Tanks of Hydropower Stations
by: Wencheng Guo, et al.
Published: (2020-12-01) -
Critical stable sectional area of downstream surge tank of hydropower plant with sloping ceiling tailrace tunnel
by: Wencheng Guo, et al.
Published: (2021-08-01) -
Corrosion Damage Detection in Headrace Tunnel Using YOLOv7 with Continuous Wall Images
by: Shiori Kubo, et al.
Published: (2023-08-01)