Research on CFETR 110 kV Cable Grounding Scheme
[Introduction] China Fusion Engineering Experimental Reactror (CFETR) aims to demonstrate the engineering feasibility of steady-state combustion plasma. The 110 kV high-voltage power supply and distribution system supplies the superconducting magnet and the reactive power system through cables and o...
Main Authors: | Peng LI, Yuchen WANG, Jiafu JIANG, Yiyun HUANG |
---|---|
Format: | Article |
Language: | English |
Published: |
Energy Observer Magazine Co., Ltd.
2022-06-01
|
Series: | 南方能源建设 |
Subjects: | |
Online Access: | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2022.02.005 |
Similar Items
-
Design of substation grounding grid in CFETR
by: Yuchen Wang, et al.
Published: (2024-10-01) -
Aging Detection of 110 kV XLPE Cable for a CFETR Power Supply System Based on Deep Neural Network
by: Hui Chen, et al.
Published: (2022-04-01) -
Research on the monitoring system for induced voltage and ground current of 27.5 kV cable sheath in railways
by: Zehui Zhang, et al.
Published: (2024-10-01) -
Assessment of the Risk of Damage to 110 kV Overhead Lines Due to Wind
by: Andrew Lukas Chojnacki
Published: (2021-01-01) -
Induced sheath voltages in 110 kV power cables – case study*
by: Czapp Stanislaw, et al.
Published: (2015-09-01)