Skip to content
VuFind
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
    • Հայերէն
    • Українська
    • Sámegiella
    • Монгол
Advanced
  • Corrigendum to “Optimal placem...
  • Cite this
  • Text this
  • Email this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
Corrigendum to “Optimal placement of two soil soundings for rectangular footings” [J. Rock Mech. Geotech. Eng. 13 (2021) 603–611]

Corrigendum to “Optimal placement of two soil soundings for rectangular footings” [J. Rock Mech. Geotech. Eng. 13 (2021) 603–611]

Bibliographic Details
Main Author: Marcin Chwała
Format: Article
Language:English
Published: Elsevier 2022-04-01
Series:Journal of Rock Mechanics and Geotechnical Engineering
Online Access:http://www.sciencedirect.com/science/article/pii/S1674775522000312
  • Holdings
  • Description
  • Similar Items
  • Staff View
Description
ISSN:1674-7755

Similar Items

  • Corrigendum to “Optimizing the evolution of strength for lime-stabilized rammed soil” [J Rock Mech Geotech Eng 11 (2019) 882–891]
    by: Jair de Jesús Arrieta Baldovino, et al.
    Published: (2020-02-01)
  • Corrigendum to “Non-classical solutions of a continuum model for rock descriptions” [J Rock Mech Geotech Eng 6 (3) (2014) 180–185]
    by: Mikhail A. Guzev
    Published: (2015-06-01)
  • Corrigendum to “Mechanical behaviors of backfill-rock composites: Physical shear test and back-analysis” [J rock Mech Geotech Eng 3 (2024) 807–827]
    by: Jie Xin, et al.
    Published: (2025-02-01)
  • Discussion on “Impact of orientation of blast initiation on ground vibrations” [J Rock Mech Geotech Eng 15 (2022) 255–261]
    by: Tadeusz Chrzan
    Published: (2023-01-01)
  • Corrigendum to “Back-analysing rock mass modulus from monitoring data of two tunnels in Sydney, Australia” [J Rock Mech Geotech Eng 5 (2017) 877–891]
    by: Robert Bertuzzi
    Published: (2018-02-01)

Search Options

  • Search History
  • Advanced Search

Find More

  • Browse the Catalog
  • Browse Alphabetically
  • Explore Channels
  • Course Reserves
  • New Items

Need Help?

  • Search Tips
  • Ask a Librarian
  • FAQs