Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning

The aim of the article is the development of methods for optimal overhaul planning of compressor station equipment. Nowadays, due to uncertainties in the forecast of gas supply flow rates, increasing the reliability and energy efficiency of main gas pipelines is an urgent problem. The dependence of...

Full description

Bibliographic Details
Main Authors: Volodymyr Grudz, Yaroslav Grudz, Ivan Pavlenko, Oleksandr Liaposhchenko, Marek Ochowiak, Vasyl Pidluskiy, Oleksandr Portechyn, Mykola Iakymiv, Sylwia Włodarczak, Andżelika Krupińska, Magdalena Matuszak, Krystian Czernek
Format: Article
Language:English
Published: MDPI AG 2023-01-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/16/2/986
_version_ 1827626166313287680
author Volodymyr Grudz
Yaroslav Grudz
Ivan Pavlenko
Oleksandr Liaposhchenko
Marek Ochowiak
Vasyl Pidluskiy
Oleksandr Portechyn
Mykola Iakymiv
Sylwia Włodarczak
Andżelika Krupińska
Magdalena Matuszak
Krystian Czernek
author_facet Volodymyr Grudz
Yaroslav Grudz
Ivan Pavlenko
Oleksandr Liaposhchenko
Marek Ochowiak
Vasyl Pidluskiy
Oleksandr Portechyn
Mykola Iakymiv
Sylwia Włodarczak
Andżelika Krupińska
Magdalena Matuszak
Krystian Czernek
author_sort Volodymyr Grudz
collection DOAJ
description The aim of the article is the development of methods for optimal overhaul planning of compressor station equipment. Nowadays, due to uncertainties in the forecast of gas supply flow rates, increasing the reliability and energy efficiency of main gas pipelines is an urgent problem. The dependence of operating costs for major repairs on the maintenance periodicity is extreme. Reducing equipment’s maintenance period leads to an increase in repair costs. It also increases the reliability of equipment operation. Overall, all these facts reduce the probability of emergency failures and related expenses for emergency recovery, gas losses, and undersupply to consumers. Therefore, an optimal maintenance frequency exists, at which the total operating costs will be minimal. A procedure for optimizing the periodicity of repairs and equipment replacement is proposed. It was realized by constructing an objective function as a dependence of exploitation costs on the inter-repair period of major repairs. A probabilistic approach was applied to assess the aging process. The characteristics of the equipment’s state are described by distribution densities (i.e., pre-repair, inter-repair, and full-service life), which vary depending on product initialization time. The main characteristics of major repairs are their duration and intensity, which are evaluated by the quality factor related to repair costs. The extremum of the objective function is sought by the method of competing options. It was determined that the optimal management of the frequency of equipment replacement can be realized by choosing the optimal values of the average service life, average operation time of units until the first planned and preventive repair, and quality factor. As a result, the required technical condition for the technological equipment is ensured under minimum operating costs without reducing the system’s reliability.
first_indexed 2024-03-09T12:50:00Z
format Article
id doaj.art-6943d39f6ba94d25bcecddc29d968ed2
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-09T12:50:00Z
publishDate 2023-01-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-6943d39f6ba94d25bcecddc29d968ed22023-11-30T22:07:52ZengMDPI AGEnergies1996-10732023-01-0116298610.3390/en16020986Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul PlanningVolodymyr Grudz0Yaroslav Grudz1Ivan Pavlenko2Oleksandr Liaposhchenko3Marek Ochowiak4Vasyl Pidluskiy5Oleksandr Portechyn6Mykola Iakymiv7Sylwia Włodarczak8Andżelika Krupińska9Magdalena Matuszak10Krystian Czernek11Department of Gas and Oil Pipelines and Gas and Oil Storage, Ivano-Frankivsk National Technical University of Oil and Gas, 15, Karpatska St., 76019 Ivano-Frankivsk, UkraineDepartment of Gas and Oil Pipelines and Gas and Oil Storage, Ivano-Frankivsk National Technical University of Oil and Gas, 15, Karpatska St., 76019 Ivano-Frankivsk, UkraineFaculty of Technical Systems and Energy Efficient Technologies, Sumy State University, 40007 Sumy, UkraineFaculty of Technical Systems and Energy Efficient Technologies, Sumy State University, 40007 Sumy, UkraineDepartment of Chemical Engineering and Equipment, Poznan University of Technology, 60-965 Poznan, PolandDepartment of Gas and Oil Pipelines and Gas and Oil Storage, Ivano-Frankivsk National Technical University of Oil and Gas, 15, Karpatska St., 76019 Ivano-Frankivsk, UkraineDepartment of Gas and Oil Pipelines and Gas and Oil Storage, Ivano-Frankivsk National Technical University of Oil and Gas, 15, Karpatska St., 76019 Ivano-Frankivsk, Ukraine“Geogazcentr” LLC, 18/20, Turivska St., 04080 Kyiv, UkraineDepartment of Chemical Engineering and Equipment, Poznan University of Technology, 60-965 Poznan, PolandDepartment of Chemical Engineering and Equipment, Poznan University of Technology, 60-965 Poznan, PolandDepartment of Chemical Engineering and Equipment, Poznan University of Technology, 60-965 Poznan, PolandFaculty of Mechanical Engineering, Opole University of Technology, 45-758 Opole, PolandThe aim of the article is the development of methods for optimal overhaul planning of compressor station equipment. Nowadays, due to uncertainties in the forecast of gas supply flow rates, increasing the reliability and energy efficiency of main gas pipelines is an urgent problem. The dependence of operating costs for major repairs on the maintenance periodicity is extreme. Reducing equipment’s maintenance period leads to an increase in repair costs. It also increases the reliability of equipment operation. Overall, all these facts reduce the probability of emergency failures and related expenses for emergency recovery, gas losses, and undersupply to consumers. Therefore, an optimal maintenance frequency exists, at which the total operating costs will be minimal. A procedure for optimizing the periodicity of repairs and equipment replacement is proposed. It was realized by constructing an objective function as a dependence of exploitation costs on the inter-repair period of major repairs. A probabilistic approach was applied to assess the aging process. The characteristics of the equipment’s state are described by distribution densities (i.e., pre-repair, inter-repair, and full-service life), which vary depending on product initialization time. The main characteristics of major repairs are their duration and intensity, which are evaluated by the quality factor related to repair costs. The extremum of the objective function is sought by the method of competing options. It was determined that the optimal management of the frequency of equipment replacement can be realized by choosing the optimal values of the average service life, average operation time of units until the first planned and preventive repair, and quality factor. As a result, the required technical condition for the technological equipment is ensured under minimum operating costs without reducing the system’s reliability.https://www.mdpi.com/1996-1073/16/2/986compressor stationenergy sourceenergy efficiencyoperational reliability
spellingShingle Volodymyr Grudz
Yaroslav Grudz
Ivan Pavlenko
Oleksandr Liaposhchenko
Marek Ochowiak
Vasyl Pidluskiy
Oleksandr Portechyn
Mykola Iakymiv
Sylwia Włodarczak
Andżelika Krupińska
Magdalena Matuszak
Krystian Czernek
Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning
Energies
compressor station
energy source
energy efficiency
operational reliability
title Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning
title_full Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning
title_fullStr Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning
title_full_unstemmed Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning
title_short Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning
title_sort ensuring the reliability of gas supply systems by optimizing the overhaul planning
topic compressor station
energy source
energy efficiency
operational reliability
url https://www.mdpi.com/1996-1073/16/2/986
work_keys_str_mv AT volodymyrgrudz ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT yaroslavgrudz ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT ivanpavlenko ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT oleksandrliaposhchenko ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT marekochowiak ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT vasylpidluskiy ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT oleksandrportechyn ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT mykolaiakymiv ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT sylwiawłodarczak ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT andzelikakrupinska ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT magdalenamatuszak ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning
AT krystianczernek ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning