Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning
The aim of the article is the development of methods for optimal overhaul planning of compressor station equipment. Nowadays, due to uncertainties in the forecast of gas supply flow rates, increasing the reliability and energy efficiency of main gas pipelines is an urgent problem. The dependence of...
Main Authors: | , , , , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-01-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/16/2/986 |
_version_ | 1827626166313287680 |
---|---|
author | Volodymyr Grudz Yaroslav Grudz Ivan Pavlenko Oleksandr Liaposhchenko Marek Ochowiak Vasyl Pidluskiy Oleksandr Portechyn Mykola Iakymiv Sylwia Włodarczak Andżelika Krupińska Magdalena Matuszak Krystian Czernek |
author_facet | Volodymyr Grudz Yaroslav Grudz Ivan Pavlenko Oleksandr Liaposhchenko Marek Ochowiak Vasyl Pidluskiy Oleksandr Portechyn Mykola Iakymiv Sylwia Włodarczak Andżelika Krupińska Magdalena Matuszak Krystian Czernek |
author_sort | Volodymyr Grudz |
collection | DOAJ |
description | The aim of the article is the development of methods for optimal overhaul planning of compressor station equipment. Nowadays, due to uncertainties in the forecast of gas supply flow rates, increasing the reliability and energy efficiency of main gas pipelines is an urgent problem. The dependence of operating costs for major repairs on the maintenance periodicity is extreme. Reducing equipment’s maintenance period leads to an increase in repair costs. It also increases the reliability of equipment operation. Overall, all these facts reduce the probability of emergency failures and related expenses for emergency recovery, gas losses, and undersupply to consumers. Therefore, an optimal maintenance frequency exists, at which the total operating costs will be minimal. A procedure for optimizing the periodicity of repairs and equipment replacement is proposed. It was realized by constructing an objective function as a dependence of exploitation costs on the inter-repair period of major repairs. A probabilistic approach was applied to assess the aging process. The characteristics of the equipment’s state are described by distribution densities (i.e., pre-repair, inter-repair, and full-service life), which vary depending on product initialization time. The main characteristics of major repairs are their duration and intensity, which are evaluated by the quality factor related to repair costs. The extremum of the objective function is sought by the method of competing options. It was determined that the optimal management of the frequency of equipment replacement can be realized by choosing the optimal values of the average service life, average operation time of units until the first planned and preventive repair, and quality factor. As a result, the required technical condition for the technological equipment is ensured under minimum operating costs without reducing the system’s reliability. |
first_indexed | 2024-03-09T12:50:00Z |
format | Article |
id | doaj.art-6943d39f6ba94d25bcecddc29d968ed2 |
institution | Directory Open Access Journal |
issn | 1996-1073 |
language | English |
last_indexed | 2024-03-09T12:50:00Z |
publishDate | 2023-01-01 |
publisher | MDPI AG |
record_format | Article |
series | Energies |
spelling | doaj.art-6943d39f6ba94d25bcecddc29d968ed22023-11-30T22:07:52ZengMDPI AGEnergies1996-10732023-01-0116298610.3390/en16020986Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul PlanningVolodymyr Grudz0Yaroslav Grudz1Ivan Pavlenko2Oleksandr Liaposhchenko3Marek Ochowiak4Vasyl Pidluskiy5Oleksandr Portechyn6Mykola Iakymiv7Sylwia Włodarczak8Andżelika Krupińska9Magdalena Matuszak10Krystian Czernek11Department of Gas and Oil Pipelines and Gas and Oil Storage, Ivano-Frankivsk National Technical University of Oil and Gas, 15, Karpatska St., 76019 Ivano-Frankivsk, UkraineDepartment of Gas and Oil Pipelines and Gas and Oil Storage, Ivano-Frankivsk National Technical University of Oil and Gas, 15, Karpatska St., 76019 Ivano-Frankivsk, UkraineFaculty of Technical Systems and Energy Efficient Technologies, Sumy State University, 40007 Sumy, UkraineFaculty of Technical Systems and Energy Efficient Technologies, Sumy State University, 40007 Sumy, UkraineDepartment of Chemical Engineering and Equipment, Poznan University of Technology, 60-965 Poznan, PolandDepartment of Gas and Oil Pipelines and Gas and Oil Storage, Ivano-Frankivsk National Technical University of Oil and Gas, 15, Karpatska St., 76019 Ivano-Frankivsk, UkraineDepartment of Gas and Oil Pipelines and Gas and Oil Storage, Ivano-Frankivsk National Technical University of Oil and Gas, 15, Karpatska St., 76019 Ivano-Frankivsk, Ukraine“Geogazcentr” LLC, 18/20, Turivska St., 04080 Kyiv, UkraineDepartment of Chemical Engineering and Equipment, Poznan University of Technology, 60-965 Poznan, PolandDepartment of Chemical Engineering and Equipment, Poznan University of Technology, 60-965 Poznan, PolandDepartment of Chemical Engineering and Equipment, Poznan University of Technology, 60-965 Poznan, PolandFaculty of Mechanical Engineering, Opole University of Technology, 45-758 Opole, PolandThe aim of the article is the development of methods for optimal overhaul planning of compressor station equipment. Nowadays, due to uncertainties in the forecast of gas supply flow rates, increasing the reliability and energy efficiency of main gas pipelines is an urgent problem. The dependence of operating costs for major repairs on the maintenance periodicity is extreme. Reducing equipment’s maintenance period leads to an increase in repair costs. It also increases the reliability of equipment operation. Overall, all these facts reduce the probability of emergency failures and related expenses for emergency recovery, gas losses, and undersupply to consumers. Therefore, an optimal maintenance frequency exists, at which the total operating costs will be minimal. A procedure for optimizing the periodicity of repairs and equipment replacement is proposed. It was realized by constructing an objective function as a dependence of exploitation costs on the inter-repair period of major repairs. A probabilistic approach was applied to assess the aging process. The characteristics of the equipment’s state are described by distribution densities (i.e., pre-repair, inter-repair, and full-service life), which vary depending on product initialization time. The main characteristics of major repairs are their duration and intensity, which are evaluated by the quality factor related to repair costs. The extremum of the objective function is sought by the method of competing options. It was determined that the optimal management of the frequency of equipment replacement can be realized by choosing the optimal values of the average service life, average operation time of units until the first planned and preventive repair, and quality factor. As a result, the required technical condition for the technological equipment is ensured under minimum operating costs without reducing the system’s reliability.https://www.mdpi.com/1996-1073/16/2/986compressor stationenergy sourceenergy efficiencyoperational reliability |
spellingShingle | Volodymyr Grudz Yaroslav Grudz Ivan Pavlenko Oleksandr Liaposhchenko Marek Ochowiak Vasyl Pidluskiy Oleksandr Portechyn Mykola Iakymiv Sylwia Włodarczak Andżelika Krupińska Magdalena Matuszak Krystian Czernek Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning Energies compressor station energy source energy efficiency operational reliability |
title | Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning |
title_full | Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning |
title_fullStr | Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning |
title_full_unstemmed | Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning |
title_short | Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning |
title_sort | ensuring the reliability of gas supply systems by optimizing the overhaul planning |
topic | compressor station energy source energy efficiency operational reliability |
url | https://www.mdpi.com/1996-1073/16/2/986 |
work_keys_str_mv | AT volodymyrgrudz ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT yaroslavgrudz ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT ivanpavlenko ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT oleksandrliaposhchenko ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT marekochowiak ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT vasylpidluskiy ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT oleksandrportechyn ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT mykolaiakymiv ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT sylwiawłodarczak ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT andzelikakrupinska ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT magdalenamatuszak ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning AT krystianczernek ensuringthereliabilityofgassupplysystemsbyoptimizingtheoverhaulplanning |