Evaluation of Bulusan Landfill Capacity in Banyuwangi

Abstract. The Bulusan landfill of Banyuwangi has 1.5 ha to accommodate garbage from 13 districts with an input of 451.8 m3 of garbage per day and controlled landfill methods are carried out as garbage management. This research aims to evaluate the capacity of the Bulusan Landfill in Banyuwangi. Arit...

Full description

Bibliographic Details
Main Authors: Abdul Holik, Zulis Erwanto, Mohammad Aziz Yusuf
Format: Article
Language:Indonesian
Published: Politeknik Negeri Bali 2019-11-01
Series:Logic
Online Access:http://ojs.pnb.ac.id/index.php/LOGIC/article/view/1212
_version_ 1818560997248466944
author Abdul Holik
Zulis Erwanto
Mohammad Aziz Yusuf
author_facet Abdul Holik
Zulis Erwanto
Mohammad Aziz Yusuf
author_sort Abdul Holik
collection DOAJ
description Abstract. The Bulusan landfill of Banyuwangi has 1.5 ha to accommodate garbage from 13 districts with an input of 451.8 m3 of garbage per day and controlled landfill methods are carried out as garbage management. This research aims to evaluate the capacity of the Bulusan Landfill in Banyuwangi. Arithmetic, geometric and least square method were selected by the highest correlation value. The projection result of the Bulusan landfill for 2018 has been declared overloaded, with the height of embankment was higher than the planned embankment and it has not been able to accommodate garbage. The projection for the next 15 years from 2017 to 2031 was predicted that Bulusan landfill will be overloaded at 1.172.185 m3 of garbage volume. Financial and technical feasibility studies for candidates for the Bulusan landfill replacement need to be carried out so that the Bulusan landfill replacement project can be realized immediately.
first_indexed 2024-12-14T00:45:23Z
format Article
id doaj.art-696def32aa3d4005ae148f3632a01a45
institution Directory Open Access Journal
issn 1412-114X
2580-5649
language Indonesian
last_indexed 2024-12-14T00:45:23Z
publishDate 2019-11-01
publisher Politeknik Negeri Bali
record_format Article
series Logic
spelling doaj.art-696def32aa3d4005ae148f3632a01a452022-12-21T23:24:09ZindPoliteknik Negeri BaliLogic1412-114X2580-56492019-11-0119310711410.31940/logic.v19i3.12121212Evaluation of Bulusan Landfill Capacity in BanyuwangiAbdul Holik0Zulis Erwanto1Mohammad Aziz Yusuf2Politeknik Negeri BanyuwangiPoliteknik Negeri BanyuwangiPoliteknik Negeri BanyuwangiAbstract. The Bulusan landfill of Banyuwangi has 1.5 ha to accommodate garbage from 13 districts with an input of 451.8 m3 of garbage per day and controlled landfill methods are carried out as garbage management. This research aims to evaluate the capacity of the Bulusan Landfill in Banyuwangi. Arithmetic, geometric and least square method were selected by the highest correlation value. The projection result of the Bulusan landfill for 2018 has been declared overloaded, with the height of embankment was higher than the planned embankment and it has not been able to accommodate garbage. The projection for the next 15 years from 2017 to 2031 was predicted that Bulusan landfill will be overloaded at 1.172.185 m3 of garbage volume. Financial and technical feasibility studies for candidates for the Bulusan landfill replacement need to be carried out so that the Bulusan landfill replacement project can be realized immediately.http://ojs.pnb.ac.id/index.php/LOGIC/article/view/1212
spellingShingle Abdul Holik
Zulis Erwanto
Mohammad Aziz Yusuf
Evaluation of Bulusan Landfill Capacity in Banyuwangi
Logic
title Evaluation of Bulusan Landfill Capacity in Banyuwangi
title_full Evaluation of Bulusan Landfill Capacity in Banyuwangi
title_fullStr Evaluation of Bulusan Landfill Capacity in Banyuwangi
title_full_unstemmed Evaluation of Bulusan Landfill Capacity in Banyuwangi
title_short Evaluation of Bulusan Landfill Capacity in Banyuwangi
title_sort evaluation of bulusan landfill capacity in banyuwangi
url http://ojs.pnb.ac.id/index.php/LOGIC/article/view/1212
work_keys_str_mv AT abdulholik evaluationofbulusanlandfillcapacityinbanyuwangi
AT zuliserwanto evaluationofbulusanlandfillcapacityinbanyuwangi
AT mohammadazizyusuf evaluationofbulusanlandfillcapacityinbanyuwangi