Evaluation of Bulusan Landfill Capacity in Banyuwangi
Abstract. The Bulusan landfill of Banyuwangi has 1.5 ha to accommodate garbage from 13 districts with an input of 451.8 m3 of garbage per day and controlled landfill methods are carried out as garbage management. This research aims to evaluate the capacity of the Bulusan Landfill in Banyuwangi. Arit...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Politeknik Negeri Bali
2019-11-01
|
Series: | Logic |
Online Access: | http://ojs.pnb.ac.id/index.php/LOGIC/article/view/1212 |
_version_ | 1818560997248466944 |
---|---|
author | Abdul Holik Zulis Erwanto Mohammad Aziz Yusuf |
author_facet | Abdul Holik Zulis Erwanto Mohammad Aziz Yusuf |
author_sort | Abdul Holik |
collection | DOAJ |
description | Abstract. The Bulusan landfill of Banyuwangi has 1.5 ha to accommodate garbage from 13 districts with an input of 451.8 m3 of garbage per day and controlled landfill methods are carried out as garbage management. This research aims to evaluate the capacity of the Bulusan Landfill in Banyuwangi. Arithmetic, geometric and least square method were selected by the highest correlation value. The projection result of the Bulusan landfill for 2018 has been declared overloaded, with the height of embankment was higher than the planned embankment and it has not been able to accommodate garbage. The projection for the next 15 years from 2017 to 2031 was predicted that Bulusan landfill will be overloaded at 1.172.185 m3 of garbage volume. Financial and technical feasibility studies for candidates for the Bulusan landfill replacement need to be carried out so that the Bulusan landfill replacement project can be realized immediately. |
first_indexed | 2024-12-14T00:45:23Z |
format | Article |
id | doaj.art-696def32aa3d4005ae148f3632a01a45 |
institution | Directory Open Access Journal |
issn | 1412-114X 2580-5649 |
language | Indonesian |
last_indexed | 2024-12-14T00:45:23Z |
publishDate | 2019-11-01 |
publisher | Politeknik Negeri Bali |
record_format | Article |
series | Logic |
spelling | doaj.art-696def32aa3d4005ae148f3632a01a452022-12-21T23:24:09ZindPoliteknik Negeri BaliLogic1412-114X2580-56492019-11-0119310711410.31940/logic.v19i3.12121212Evaluation of Bulusan Landfill Capacity in BanyuwangiAbdul Holik0Zulis Erwanto1Mohammad Aziz Yusuf2Politeknik Negeri BanyuwangiPoliteknik Negeri BanyuwangiPoliteknik Negeri BanyuwangiAbstract. The Bulusan landfill of Banyuwangi has 1.5 ha to accommodate garbage from 13 districts with an input of 451.8 m3 of garbage per day and controlled landfill methods are carried out as garbage management. This research aims to evaluate the capacity of the Bulusan Landfill in Banyuwangi. Arithmetic, geometric and least square method were selected by the highest correlation value. The projection result of the Bulusan landfill for 2018 has been declared overloaded, with the height of embankment was higher than the planned embankment and it has not been able to accommodate garbage. The projection for the next 15 years from 2017 to 2031 was predicted that Bulusan landfill will be overloaded at 1.172.185 m3 of garbage volume. Financial and technical feasibility studies for candidates for the Bulusan landfill replacement need to be carried out so that the Bulusan landfill replacement project can be realized immediately.http://ojs.pnb.ac.id/index.php/LOGIC/article/view/1212 |
spellingShingle | Abdul Holik Zulis Erwanto Mohammad Aziz Yusuf Evaluation of Bulusan Landfill Capacity in Banyuwangi Logic |
title | Evaluation of Bulusan Landfill Capacity in Banyuwangi |
title_full | Evaluation of Bulusan Landfill Capacity in Banyuwangi |
title_fullStr | Evaluation of Bulusan Landfill Capacity in Banyuwangi |
title_full_unstemmed | Evaluation of Bulusan Landfill Capacity in Banyuwangi |
title_short | Evaluation of Bulusan Landfill Capacity in Banyuwangi |
title_sort | evaluation of bulusan landfill capacity in banyuwangi |
url | http://ojs.pnb.ac.id/index.php/LOGIC/article/view/1212 |
work_keys_str_mv | AT abdulholik evaluationofbulusanlandfillcapacityinbanyuwangi AT zuliserwanto evaluationofbulusanlandfillcapacityinbanyuwangi AT mohammadazizyusuf evaluationofbulusanlandfillcapacityinbanyuwangi |