Optimisation and Just-in-Time
Arranging production activities to fit in with other construction activities is one of the basic ideas of the Just-in-Time approach. In the construction industry it has never been very fully applied. This is a mistake [1]. Construction works, particularly expensive parts of them, are a field where t...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
CTU Central Library
2002-01-01
|
Series: | Acta Polytechnica |
Subjects: | |
Online Access: | https://ojs.cvut.cz/ojs/index.php/ap/article/view/338 |
_version_ | 1811243322261372928 |
---|---|
author | V. Beran |
author_facet | V. Beran |
author_sort | V. Beran |
collection | DOAJ |
description | Arranging production activities to fit in with other construction activities is one of the basic ideas of the Just-in-Time approach. In the construction industry it has never been very fully applied. This is a mistake [1]. Construction works, particularly expensive parts of them, are a field where the approach can be and should be applied. |
first_indexed | 2024-04-12T14:06:25Z |
format | Article |
id | doaj.art-6998ecd831404eed871928a3e8bda9d9 |
institution | Directory Open Access Journal |
issn | 1210-2709 1805-2363 |
language | English |
last_indexed | 2024-04-12T14:06:25Z |
publishDate | 2002-01-01 |
publisher | CTU Central Library |
record_format | Article |
series | Acta Polytechnica |
spelling | doaj.art-6998ecd831404eed871928a3e8bda9d92022-12-22T03:30:04ZengCTU Central LibraryActa Polytechnica1210-27091805-23632002-01-01422338Optimisation and Just-in-TimeV. BeranArranging production activities to fit in with other construction activities is one of the basic ideas of the Just-in-Time approach. In the construction industry it has never been very fully applied. This is a mistake [1]. Construction works, particularly expensive parts of them, are a field where the approach can be and should be applied.https://ojs.cvut.cz/ojs/index.php/ap/article/view/338Just-in-Time approachproduction speedsproduction volumesoptimisation savingsdependent capacity expansionrisk of extra costs |
spellingShingle | V. Beran Optimisation and Just-in-Time Acta Polytechnica Just-in-Time approach production speeds production volumes optimisation savings dependent capacity expansion risk of extra costs |
title | Optimisation and Just-in-Time |
title_full | Optimisation and Just-in-Time |
title_fullStr | Optimisation and Just-in-Time |
title_full_unstemmed | Optimisation and Just-in-Time |
title_short | Optimisation and Just-in-Time |
title_sort | optimisation and just in time |
topic | Just-in-Time approach production speeds production volumes optimisation savings dependent capacity expansion risk of extra costs |
url | https://ojs.cvut.cz/ojs/index.php/ap/article/view/338 |
work_keys_str_mv | AT vberan optimisationandjustintime |