Simulation-based Planning Model for Table Formwork Operation in Tall Building Construction
Operation planning for table formwork using a crane-independent lifting system (CLS) is a crucial factor affecting productivity for formwork in tall building construction. Inappropriate heuristic operation plans are likely to increase work duration because of temporarily displaced stacks of table fo...
Main Authors: | Hyunsu Lim, Taehoon Kim, Hunhee Cho, Kyung-In Kang |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2017-01-01
|
Series: | Journal of Asian Architecture and Building Engineering |
Subjects: | |
Online Access: | http://dx.doi.org/10.3130/jaabe.16.115 |
Similar Items
-
A Dynamic Model for Effective and Optimal Planning of Formwork in Construction Projects
by: Renata Baskova, et al.
Published: (2023-07-01) -
Applicability of Formwork Automation Design Software for Aluminum Formwork
by: Bokyeong Lee, et al.
Published: (2020-12-01) -
Utilising Building Component Data from BIM for Formwork Planning
by: Manav Mahan Singh, et al.
Published: (2017-12-01) -
Selection of formwork options when constructing high-rise buildings by AHP method (Case Study: Cao Lanh city, Vietnam)
by: Tran Ngoc-Long, et al.
Published: (2023-01-01) -
Efficiency of Using PERI Formwork in Low-Rise Buildings Project
by: Monika Natalia, et al.
Published: (2023-11-01)