Strategy development of contractor with Contractor Full Pre-Finance (CPF) scheme using risk-based approach to increase cost performance of toll road development projects
AbstractThe construction of the toll road in Indonesia is currently being carried out very intensively and is also highly prioritized, marked by the status of the National Strategic Project (NSP) which oversees it. One of the efforts made to accelerate and increase attractiveness is to use the Contr...
Main Authors: | Wisnu Isvara, Mohammad Ichsan, Farras Ammar Muhammad, Jodi Noor Handibyanto, Sri Bramantoro Abdinagoro |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2023-12-01
|
Series: | Cogent Engineering |
Subjects: | |
Online Access: | https://www.tandfonline.com/doi/10.1080/23311916.2023.2243718 |
Similar Items
-
Development of a risk-based strategy implementation of a full pre-financed contractor scheme (CPF) in toll road projects to improve time performance
by: Mohammad Ichsan, et al.
Published: (2024-12-01) -
Planning and the contractor
by: 3999 Intermediate Technology Development Group
Published: (1969) -
Study on the performance and development of class F contractors in Samarahan division /
by: 267581 Lim, Lip Chong
Published: (2004) -
The contractors /
by: 527324 Ferguson, Hugh, et al.
Published: (2014) -
Liability of the specialist contractor in construction work /
by: Joharudin Samion, 1974-, et al.
Published: (2008)