Established Method of High-Speed Railway Survey Control Network
It is very important of high-speed railway construction surveying and mapping. Especially the establishment of construction survey control network and searching aiming at layout, measurement, data processing of adjustment calculation of the horizontal control network and the elevation control networ...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201712401001 |
_version_ | 1818326348835323904 |
---|---|
author | Wang H.Y. Yang F.Y. Gao J.F. |
author_facet | Wang H.Y. Yang F.Y. Gao J.F. |
author_sort | Wang H.Y. |
collection | DOAJ |
description | It is very important of high-speed railway construction surveying and mapping. Especially the establishment of construction survey control network and searching aiming at layout, measurement, data processing of adjustment calculation of the horizontal control network and the elevation control network. The most important part is the establishment of CP II and CPIII control network. The elevation control mainly adopts second order leveling. Horizontal and elevation accuracy must to meet the requirements of high speed railway construction survey. |
first_indexed | 2024-12-13T11:58:57Z |
format | Article |
id | doaj.art-6bf5a3eb2778407cb381998e101cc77f |
institution | Directory Open Access Journal |
issn | 2261-236X |
language | English |
last_indexed | 2024-12-13T11:58:57Z |
publishDate | 2017-01-01 |
publisher | EDP Sciences |
record_format | Article |
series | MATEC Web of Conferences |
spelling | doaj.art-6bf5a3eb2778407cb381998e101cc77f2022-12-21T23:47:08ZengEDP SciencesMATEC Web of Conferences2261-236X2017-01-011240100110.1051/matecconf/201712401001matecconf_ictte2017_01001Established Method of High-Speed Railway Survey Control NetworkWang H.Y.Yang F.Y.Gao J.F.It is very important of high-speed railway construction surveying and mapping. Especially the establishment of construction survey control network and searching aiming at layout, measurement, data processing of adjustment calculation of the horizontal control network and the elevation control network. The most important part is the establishment of CP II and CPIII control network. The elevation control mainly adopts second order leveling. Horizontal and elevation accuracy must to meet the requirements of high speed railway construction survey.https://doi.org/10.1051/matecconf/201712401001 |
spellingShingle | Wang H.Y. Yang F.Y. Gao J.F. Established Method of High-Speed Railway Survey Control Network MATEC Web of Conferences |
title | Established Method of High-Speed Railway Survey Control Network |
title_full | Established Method of High-Speed Railway Survey Control Network |
title_fullStr | Established Method of High-Speed Railway Survey Control Network |
title_full_unstemmed | Established Method of High-Speed Railway Survey Control Network |
title_short | Established Method of High-Speed Railway Survey Control Network |
title_sort | established method of high speed railway survey control network |
url | https://doi.org/10.1051/matecconf/201712401001 |
work_keys_str_mv | AT wanghy establishedmethodofhighspeedrailwaysurveycontrolnetwork AT yangfy establishedmethodofhighspeedrailwaysurveycontrolnetwork AT gaojf establishedmethodofhighspeedrailwaysurveycontrolnetwork |