Research on Construction Mode of Large-Scale Offshore Wind Power Centralized Transmission
[Introduction] Offshore wind power has become a research hotspot in the development of global wind power. China's offshore wind power is still in its infancy, the current operation mode is not conducive to the large-scale centralized transmission of offshore wind power and cannot adapt to the l...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Energy Observer Magazine Co., Ltd.
2023-01-01
|
Series: | 南方能源建设 |
Subjects: | |
Online Access: | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.01.002 |
_version_ | 1827977318685999104 |
---|---|
author | Zhanzhi LIU Shichao WANG Weihan HAO Ni LI |
author_facet | Zhanzhi LIU Shichao WANG Weihan HAO Ni LI |
author_sort | Zhanzhi LIU |
collection | DOAJ |
description | [Introduction] Offshore wind power has become a research hotspot in the development of global wind power. China's offshore wind power is still in its infancy, the current operation mode is not conducive to the large-scale centralized transmission of offshore wind power and cannot adapt to the long-term development under the new situation. Moreover, the subsidy policies of European countries for offshore wind power conflict with China's development ideas, so they cannot be used for reference, and there are still some disadvantages in the European modes. Therefore, it is necessary to explore a new mode suitable for the development of offshore wind power in China's offshore deep-water areas. [Method] Firstly, the development status of offshore wind power in European countries was analyzed and the current transmission modes of offshore wind power were summarized. Secondly, four application scenarios of offshore wind power transmission technology were given. Finally, the feasibility of offshore wind power business model was analyzed. [Result] The results show that the connection to grid at an equal price is expected to be achieved in Guangdong during the 14th Five-Year Plan period after the separation of offshore wind power generation and transmission side links. The centralized development of offshore wind power in deep-water areas is more feasible for economy and environmental intensive utilization compared with the decentralized development. [Conclusion] The research conclusion can provide technical support for the scheme design and construction mode of the follow-up large-scale offshore wind power centralized transmission project and has a good demonstration application prospect. |
first_indexed | 2024-04-09T21:03:03Z |
format | Article |
id | doaj.art-6c8bcd54b003475aadc2239907c42824 |
institution | Directory Open Access Journal |
issn | 2095-8676 |
language | English |
last_indexed | 2024-04-09T21:03:03Z |
publishDate | 2023-01-01 |
publisher | Energy Observer Magazine Co., Ltd. |
record_format | Article |
series | 南方能源建设 |
spelling | doaj.art-6c8bcd54b003475aadc2239907c428242023-03-29T05:59:57ZengEnergy Observer Magazine Co., Ltd.南方能源建设2095-86762023-01-01101132010.16516/j.gedi.issn2095-8676.2023.01.0022022-109Research on Construction Mode of Large-Scale Offshore Wind Power Centralized TransmissionZhanzhi LIU0Shichao WANG1Weihan HAO2Ni LI3China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, Guangdong, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, Guangdong, ChinaSchool of Electrical Engineering, Xi'an Jiaotong University, Xi'an 710049, Shanxi, ChinaSchool of Electrical Engineering, Xi'an Jiaotong University, Xi'an 710049, Shanxi, China[Introduction] Offshore wind power has become a research hotspot in the development of global wind power. China's offshore wind power is still in its infancy, the current operation mode is not conducive to the large-scale centralized transmission of offshore wind power and cannot adapt to the long-term development under the new situation. Moreover, the subsidy policies of European countries for offshore wind power conflict with China's development ideas, so they cannot be used for reference, and there are still some disadvantages in the European modes. Therefore, it is necessary to explore a new mode suitable for the development of offshore wind power in China's offshore deep-water areas. [Method] Firstly, the development status of offshore wind power in European countries was analyzed and the current transmission modes of offshore wind power were summarized. Secondly, four application scenarios of offshore wind power transmission technology were given. Finally, the feasibility of offshore wind power business model was analyzed. [Result] The results show that the connection to grid at an equal price is expected to be achieved in Guangdong during the 14th Five-Year Plan period after the separation of offshore wind power generation and transmission side links. The centralized development of offshore wind power in deep-water areas is more feasible for economy and environmental intensive utilization compared with the decentralized development. [Conclusion] The research conclusion can provide technical support for the scheme design and construction mode of the follow-up large-scale offshore wind power centralized transmission project and has a good demonstration application prospect.https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.01.002offshore wind poweroffshore wind power transmission modeapplication scenariobusiness modeldevelopment experience |
spellingShingle | Zhanzhi LIU Shichao WANG Weihan HAO Ni LI Research on Construction Mode of Large-Scale Offshore Wind Power Centralized Transmission 南方能源建设 offshore wind power offshore wind power transmission mode application scenario business model development experience |
title | Research on Construction Mode of Large-Scale Offshore Wind Power Centralized Transmission |
title_full | Research on Construction Mode of Large-Scale Offshore Wind Power Centralized Transmission |
title_fullStr | Research on Construction Mode of Large-Scale Offshore Wind Power Centralized Transmission |
title_full_unstemmed | Research on Construction Mode of Large-Scale Offshore Wind Power Centralized Transmission |
title_short | Research on Construction Mode of Large-Scale Offshore Wind Power Centralized Transmission |
title_sort | research on construction mode of large scale offshore wind power centralized transmission |
topic | offshore wind power offshore wind power transmission mode application scenario business model development experience |
url | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.01.002 |
work_keys_str_mv | AT zhanzhiliu researchonconstructionmodeoflargescaleoffshorewindpowercentralizedtransmission AT shichaowang researchonconstructionmodeoflargescaleoffshorewindpowercentralizedtransmission AT weihanhao researchonconstructionmodeoflargescaleoffshorewindpowercentralizedtransmission AT nili researchonconstructionmodeoflargescaleoffshorewindpowercentralizedtransmission |