Investigating transportation system in container terminals and developing a yard crane scheduling model
The world trade has tremendous growth in marine transportation. This paper studies yard crane scheduling problem between different blocks in container terminal. Its purpose is to minimize total travel time of cranes between blocks and total delayed workload in blocks at different periods. In this wa...
Main Authors: | Hassan Javanshir, Seyed Mohammad Taghi Fatemi Ghomi, Marjan Fatemi Ghomi |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2012-01-01
|
Series: | Management Science Letters |
Subjects: | |
Online Access: | http://www.growingscience.com/msl/Vol2/msl_2011_76.pdf |
Similar Items
-
Yard Crane Scheduling to Minimize Total Weighted Vessel Loading Time in Container Terminals
by: Huang, Shell Ying, et al.
Published: (2017) -
A new approach to analyze strategy map using an integrated BSC and FUZZY DEMATEL
by: Seyed Abdollah Heydariyeh, et al.
Published: (2012-01-01) -
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
by: Hsien-Pin Hsu, et al.
Published: (2021-09-01) -
An Agent-Based Solution Framework for Inter-Block Yard Crane Scheduling Problems
by: Omor Sharif, et al.
Published: (2012-06-01) -
A Multi-Stage Approach for External Trucks and Yard Cranes Scheduling with CO<sub>2</sub> Emissions Considerations in Container Terminals
by: Ahmed Talaat, et al.
Published: (2023-11-01)