USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCH

Sometimes in building and construction projects, the sub-contractor may bring a claim made by the main contractor or the employer against the contractor, and then the latter will often seek to settle this claim. The case "John F Hunt Demolition Ltd v ASME Engineering Ltd [2007] EWHC 1507 (TCC)...

Full description

Bibliographic Details
Main Author: Mustafa Ayad Al-Shammari
Format: Article
Language:Arabic
Published: Mustansiriyah University/College of Engineering 2017-05-01
Series:Journal of Engineering and Sustainable Development
Subjects:
Online Access:https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/527
_version_ 1811233009453498368
author Mustafa Ayad Al-Shammari
author_facet Mustafa Ayad Al-Shammari
author_sort Mustafa Ayad Al-Shammari
collection DOAJ
description Sometimes in building and construction projects, the sub-contractor may bring a claim made by the main contractor or the employer against the contractor, and then the latter will often seek to settle this claim. The case "John F Hunt Demolition Ltd v ASME Engineering Ltd [2007] EWHC 1507 (TCC)" , which was under the Joint Contracts Tribunal (JCT), provides an example of this situation when the contractor (as sub-contractor in this case) settles the employer’s or main contractor’s claim, and then claims against his sub-contractor (as sub-subcontractor in this case) to recover these sums. This research is undertaken to discuss contractual issues connected to the above mentioned case, and to appraise the legal liabilities that associated with its contractual failure, and then it will appraise those liabilities under the NEC3 form of contract in order to enhance an interpretation of the NEC contracts and provide evaluation of legal implications under different legal provisions.
first_indexed 2024-04-12T11:13:29Z
format Article
id doaj.art-6cedf45927f64ecca849310a859e67ea
institution Directory Open Access Journal
issn 2520-0917
2520-0925
language Arabic
last_indexed 2024-04-12T11:13:29Z
publishDate 2017-05-01
publisher Mustansiriyah University/College of Engineering
record_format Article
series Journal of Engineering and Sustainable Development
spelling doaj.art-6cedf45927f64ecca849310a859e67ea2022-12-22T03:35:33ZaraMustansiriyah University/College of EngineeringJournal of Engineering and Sustainable Development2520-09172520-09252017-05-01213USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCHMustafa Ayad Al-Shammari0Civil Engineering Department, Al-Mustansiriyah University, Baghdad, Iraq Sometimes in building and construction projects, the sub-contractor may bring a claim made by the main contractor or the employer against the contractor, and then the latter will often seek to settle this claim. The case "John F Hunt Demolition Ltd v ASME Engineering Ltd [2007] EWHC 1507 (TCC)" , which was under the Joint Contracts Tribunal (JCT), provides an example of this situation when the contractor (as sub-contractor in this case) settles the employer’s or main contractor’s claim, and then claims against his sub-contractor (as sub-subcontractor in this case) to recover these sums. This research is undertaken to discuss contractual issues connected to the above mentioned case, and to appraise the legal liabilities that associated with its contractual failure, and then it will appraise those liabilities under the NEC3 form of contract in order to enhance an interpretation of the NEC contracts and provide evaluation of legal implications under different legal provisions. https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/527NEC3JCTNEC contractslegal liabilitiescontractual failurejoint contracts tribunal
spellingShingle Mustafa Ayad Al-Shammari
USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCH
Journal of Engineering and Sustainable Development
NEC3
JCT
NEC contracts
legal liabilities
contractual failure
joint contracts tribunal
title USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCH
title_full USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCH
title_fullStr USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCH
title_full_unstemmed USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCH
title_short USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCH
title_sort using the new engineering contracts nec3 to consider and evaluate the legal liabilities arising from contractual failures a case study research
topic NEC3
JCT
NEC contracts
legal liabilities
contractual failure
joint contracts tribunal
url https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/527
work_keys_str_mv AT mustafaayadalshammari usingthenewengineeringcontractsnec3toconsiderandevaluatethelegalliabilitiesarisingfromcontractualfailuresacasestudyresearch