USING THE NEW ENGINEERING CONTRACTS (NEC3) TO CONSIDER AND EVALUATE THE LEGAL LIABILITIES ARISING FROM CONTRACTUAL FAILURES: A CASE STUDY RESEARCH
Sometimes in building and construction projects, the sub-contractor may bring a claim made by the main contractor or the employer against the contractor, and then the latter will often seek to settle this claim. The case "John F Hunt Demolition Ltd v ASME Engineering Ltd [2007] EWHC 1507 (TCC)...
Main Author: | Mustafa Ayad Al-Shammari |
---|---|
Format: | Article |
Language: | Arabic |
Published: |
Mustansiriyah University/College of Engineering
2017-05-01
|
Series: | Journal of Engineering and Sustainable Development |
Subjects: | |
Online Access: | https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/527 |
Similar Items
-
Understanding the NEC3 ECC contract : a practical handbook /
by: 553763 Hughes, Kelvin
Published: (2013) -
Understanding NEC3 : professional services contract : a practical handbook /
by: Hughes, Kelvin
Published: (2013) -
On the Issue of Pre-Contractual Liability Qualification
by: L. V. Shvarts
Published: (2021-01-01) -
Metabolomics in NEC: An Updated Review
by: Alice Bosco, et al.
Published: (2023-12-01) -
ANALISIS YURIDIS ASAS PACTA TERTIIS NEC NOCENT NEC PROSUNT DALAM SUKSESI TIMOR TIMUR DARI WILAYAH INDONESIA
by: Ratna Artha Windari, et al.
Published: (2018-01-01)