R&D and Application of Commissioning Tools for Reactor Protection System of High-Temperature Gas-Cooled Reactor—Pebble-Bed Module
[Introduction] This article aims to overcome the shortcomings of commissioning techniques for reactor protection systems and improve the efficiency and quality of reactor protection system commissioning. [Method] A set of automation commissioning tools was specifically designed for the reactor prote...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Energy Observer Magazine Co., Ltd.
2023-11-01
|
Series: | 南方能源建设 |
Subjects: | |
Online Access: | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.06.018 |
_version_ | 1827762370949152768 |
---|---|
author | Chuan LEI Peng CHENG Zhijun ZHANG |
author_facet | Chuan LEI Peng CHENG Zhijun ZHANG |
author_sort | Chuan LEI |
collection | DOAJ |
description | [Introduction] This article aims to overcome the shortcomings of commissioning techniques for reactor protection systems and improve the efficiency and quality of reactor protection system commissioning. [Method] A set of automation commissioning tools was specifically designed for the reactor protection system of the HTR-PM. The tools which adopted advanced technology could automatically complete the commissioning of the reactor protection system, and could greatly improve the efficiency and quality of commissioning. [Result] This article mainly elaborates on the R&D and application of the commissioning tools for the reactor protection system of HTR-PM (High-Temperature Gas-cooled Reactor—Pebble-bed Module). It introduces the R&D process, difficulties, and contents of the commissioning tools, as well as the design ideas, implementation methods, and results of automatic commissioning functions such as signal output, signal acquisition, data processing, and information display. Through the actual commissioning and application of the reactor protection system of the HTR-PM in terms of function and performance verification, these tools are able to quickly and accurately identify and solve problems during the commissioning process, demonstrating the effectiveness and usability of the tools. [Conclusion] The results show that automatic commissioning tools can improve the efficiency and quality of reactor protection system commissioning, and enhance the reliability and safety of the reactor protection system. At the same time, further research and improvement of automatic commissioning tools are still needed to meet the different commissioning needs of the reactor protection system. |
first_indexed | 2024-03-11T10:28:36Z |
format | Article |
id | doaj.art-6d749fb4b0284a9d9922ae607e872e17 |
institution | Directory Open Access Journal |
issn | 2095-8676 |
language | English |
last_indexed | 2024-03-11T10:28:36Z |
publishDate | 2023-11-01 |
publisher | Energy Observer Magazine Co., Ltd. |
record_format | Article |
series | 南方能源建设 |
spelling | doaj.art-6d749fb4b0284a9d9922ae607e872e172023-11-15T04:27:32ZengEnergy Observer Magazine Co., Ltd.南方能源建设2095-86762023-11-0110615315910.16516/j.gedi.issn2095-8676.2023.06.0182022-216R&D and Application of Commissioning Tools for Reactor Protection System of High-Temperature Gas-Cooled Reactor—Pebble-Bed ModuleChuan LEI0Peng CHENG1Zhijun ZHANG2Huaneng Shandong Shidao Bay Nuclear Power Co., Ltd., Rongcheng 264312, Shandong, ChinaHuaneng Shandong Shidao Bay Nuclear Power Co., Ltd., Rongcheng 264312, Shandong, ChinaHuaneng Shandong Shidao Bay Nuclear Power Co., Ltd., Rongcheng 264312, Shandong, China[Introduction] This article aims to overcome the shortcomings of commissioning techniques for reactor protection systems and improve the efficiency and quality of reactor protection system commissioning. [Method] A set of automation commissioning tools was specifically designed for the reactor protection system of the HTR-PM. The tools which adopted advanced technology could automatically complete the commissioning of the reactor protection system, and could greatly improve the efficiency and quality of commissioning. [Result] This article mainly elaborates on the R&D and application of the commissioning tools for the reactor protection system of HTR-PM (High-Temperature Gas-cooled Reactor—Pebble-bed Module). It introduces the R&D process, difficulties, and contents of the commissioning tools, as well as the design ideas, implementation methods, and results of automatic commissioning functions such as signal output, signal acquisition, data processing, and information display. Through the actual commissioning and application of the reactor protection system of the HTR-PM in terms of function and performance verification, these tools are able to quickly and accurately identify and solve problems during the commissioning process, demonstrating the effectiveness and usability of the tools. [Conclusion] The results show that automatic commissioning tools can improve the efficiency and quality of reactor protection system commissioning, and enhance the reliability and safety of the reactor protection system. At the same time, further research and improvement of automatic commissioning tools are still needed to meet the different commissioning needs of the reactor protection system.https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.06.018nuclear power planthigh temperature gas-cooled reactorreactor protection systemcommissioning toolsefficiency of commissioning |
spellingShingle | Chuan LEI Peng CHENG Zhijun ZHANG R&D and Application of Commissioning Tools for Reactor Protection System of High-Temperature Gas-Cooled Reactor—Pebble-Bed Module 南方能源建设 nuclear power plant high temperature gas-cooled reactor reactor protection system commissioning tools efficiency of commissioning |
title | R&D and Application of Commissioning Tools for Reactor Protection System of High-Temperature Gas-Cooled Reactor—Pebble-Bed Module |
title_full | R&D and Application of Commissioning Tools for Reactor Protection System of High-Temperature Gas-Cooled Reactor—Pebble-Bed Module |
title_fullStr | R&D and Application of Commissioning Tools for Reactor Protection System of High-Temperature Gas-Cooled Reactor—Pebble-Bed Module |
title_full_unstemmed | R&D and Application of Commissioning Tools for Reactor Protection System of High-Temperature Gas-Cooled Reactor—Pebble-Bed Module |
title_short | R&D and Application of Commissioning Tools for Reactor Protection System of High-Temperature Gas-Cooled Reactor—Pebble-Bed Module |
title_sort | r d and application of commissioning tools for reactor protection system of high temperature gas cooled reactor pebble bed module |
topic | nuclear power plant high temperature gas-cooled reactor reactor protection system commissioning tools efficiency of commissioning |
url | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.06.018 |
work_keys_str_mv | AT chuanlei rdandapplicationofcommissioningtoolsforreactorprotectionsystemofhightemperaturegascooledreactorpebblebedmodule AT pengcheng rdandapplicationofcommissioningtoolsforreactorprotectionsystemofhightemperaturegascooledreactorpebblebedmodule AT zhijunzhang rdandapplicationofcommissioningtoolsforreactorprotectionsystemofhightemperaturegascooledreactorpebblebedmodule |