Research on life cycle risk assessment of utility tunnel project base on AHP-Fuzzy
In order to comprehensively and objectively evaluate the risks faced by the underground comprehensive pipe corridor with large investment, wide coverage and long operation cycle, this paper takes a pipe corridor in Beijing as the object, based on the whole life cycle theory, identifies the risk fact...
Main Author: | Zhang Xinwen |
---|---|
Format: | Article |
Language: | English |
Published: |
Emergency Management Press
2022-06-01
|
Series: | 矿业科学学报 |
Subjects: | |
Online Access: | http://kykxxb.cumtb.edu.cn/cn/article/doi/10.19606/j.cnki.jmst.2022.03.013 |
Similar Items
-
Safety evaluation of urban underground utility tunnel with the grey clustering method based on the whole life cycle theory
by: Shaonan Sun, et al.
Published: (2022-11-01) -
Cost Allocation Mechanism Design for Urban Utility Tunnel Construction Based on Cooperative Game and Resource Dependence Theory
by: Zhi Zhang, et al.
Published: (2019-08-01) -
Evaluation of equipment integrated support effectiveness based on AHP and fuzzy comprehensive evaluation
by: QIU Xiongfei, ZHANG Hua, ZHAO Zhangpeng, ZHAO Runze
Published: (2024-04-01) -
Fuzzy comprehensive evaluation of imported alcohol safety risk based on AHP and risk matrix
by: GUO Xuewen, et al.
Published: (2023-07-01) -
Urban Tunnel Body Landscape Driving Comprehensive Evaluation Study Based on Biomass-Sensing Automobile Field Experiment
by: Zhiting Li, et al.
Published: (2023-10-01)