A Bi-Level Scheduling Model of the Distribution System With a Distribution Company and Virtual Power Plants Considering Grid Flexibility
With the emergence of virtual power plants (VPPs) in distribution systems, distribution companies (DISCOs) can manage distributed generators scattered across their systems. Interactions between each DISCO and VPP are expected to be crucial for securing system reliability without increasing operation...
Main Authors: | Hyeongon Park, Woong Ko |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2022-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9749098/ |
Similar Items
-
Optimal Scheduling of Virtual Power Plant with Flexibility Margin Considering Demand Response and Uncertainties
by: Yetuo Tan, et al.
Published: (2023-08-01) -
Two-stage optimal scheduling of virtual power plant with wind-photovoltaic-hydro-storage considering flexible load reserve
by: Yuge Chen, et al.
Published: (2022-11-01) -
Optimal Cost Management of Distributed Generation Units and Microgrids for Virtual Power Plant Scheduling
by: Seyed Iman Taheri, et al.
Published: (2020-01-01) -
A Two-Stage Optimization Strategy for Virtual Power Plants Considering the Electricity-Hydrogen Market
by: SHI Mengshu, et al.
Published: (2023-10-01) -
Mixed Integer Quadratic Programming Based Scheduling Methods for Day-Ahead Bidding and Intra-Day Operation of Virtual Power Plant
by: Rakkyung Ko, et al.
Published: (2019-04-01)