Two-Stage Robust and Economic Scheduling for Electricity-Heat Integrated Energy System under Wind Power Uncertainty
As renewable energy increasingly penetrates into electricity-heat integrated energy system (IES), the severe challenges arise for system reliability under uncertain generations. A two-stage approach consisting of pre-scheduling and re-dispatching coordination is introduced for IES under wind power u...
Main Authors: | Ruijie Liu, Zhejing Bao, Jun Zheng, Lingxia Lu, Miao Yu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-12-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/14/24/8434 |
Similar Items
-
Two-stage robust optimization of thermal-ESS units scheduling under wind uncertainty
by: Jun Wang, et al.
Published: (2022-08-01) -
Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
by: Xiaohui Zhang, et al.
Published: (2024-12-01) -
A Robust Optimization Strategy for Domestic Electric Water Heater Load Scheduling under Uncertainties
by: Jidong Wang, et al.
Published: (2017-11-01) -
Robust Optimization-Based Scheduling of Multi-Microgrids Considering Uncertainties
by: Akhtar Hussain, et al.
Published: (2016-04-01) -
Robustness price of open-pit mine production scheduling
by: Aref Alipour, et al.
Published: (2020-12-01)