Assembly Line Optimization Using MTM Time Standard and Simulation Modeling—A Case Study
This study presents an approach to solving the assembly line balancing problem (ALBP) using the Methods-Time Measurement (MTM) time standard and simulation software. ALBP is a common problem in manufacturing where a set of tasks with fixed times must be assigned to a series of sequential workstation...
Main Authors: | Matic Breznik, Borut Buchmeister, Nataša Vujica Herzog |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-05-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/13/10/6265 |
Similar Items
-
The Need for Ecosystem 4.0 to Support Maintenance 4.0: An Aviation Assembly Line Case
by: Alessandro Giacotto, et al.
Published: (2021-04-01) -
Interaction between MTM and EGAM for energy and particle confinement improvements on HL-3 tokamak
by: S.Q. Wang, et al.
Published: (2024-01-01) -
New Framework for Complex Assembly Digitalization and Traceability Using Bill of Assembly and Smart Contracts
by: Yuval Cohen, et al.
Published: (2023-02-01) -
Optimization of Industry 4.0 Implementation Selection Process towards Enhancement of a Manual Assembly Line
by: Amanda Aljinović, et al.
Published: (2021-12-01) -
Lean Manual Assembly 4.0: A Systematic Review
by: Adrian Miqueo, et al.
Published: (2020-11-01)