Optimization of the Cost of Repetitive Construction Projects Using Computerized Iteration Method

This study introduces an iterative scheduling method that combines two approaches for managing repetitive construction projects: the Critical Path Method (CPM) and the Repetitive Scheduling Method (RSM). The primary objective of this study is to demonstrate how optimization techniques can be applied...