Comparing the optimization of prestressed concrete bridge deck according to the AASHTO LRFD and AASHTO standard procedures using Cuckoo algorithm.
The high cost and time of implementation of the bridgeworks necessitate the optimization in the structural design. The optimization can extensively reduce the used steel, reinforcement, concrete and the time of doing project. In this study the effect of design elements in optimization of a bridge ha...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Semnan University
2018-12-01
|
Series: | مجله مدل سازی در مهندسی |
Subjects: | |
Online Access: | https://modelling.semnan.ac.ir/article_3471_0aa1bf2708538d378b30c83d9f0f8a25.pdf |
_version_ | 1797296539182301184 |
---|---|
author | zahra hazrati moghim ali kheyroddin Hosein Naderpour Hossein Rahmani |
author_facet | zahra hazrati moghim ali kheyroddin Hosein Naderpour Hossein Rahmani |
author_sort | zahra hazrati moghim |
collection | DOAJ |
description | The high cost and time of implementation of the bridgeworks necessitate the optimization in the structural design. The optimization can extensively reduce the used steel, reinforcement, concrete and the time of doing project. In this study the effect of design elements in optimization of a bridge have been investigated. By definition of cross section geometry, strength of material, location and number of pre-stressing cables as variable and also using Cuckoo algorithm, the best value of variables are selected and the best geometry of cross area is choice. These variables in fact are calculated based on two regulations AASHTO LRFD-2015 and standard 2002 and the results are compared. The results show that the weight minimalist and economic plan are not depended directly because of the effect of concrete, steel and pre-stressed cables and also the high strength concrete used in long bridge span. Finally, for comparison of the bridge span effect, the optimization is carried out for different lengths from 30 to 70 based on the pointed regulations in above and the results are compared |
first_indexed | 2024-03-07T22:06:13Z |
format | Article |
id | doaj.art-70928ff4c02c42f3a965c7fa4a4764b6 |
institution | Directory Open Access Journal |
issn | 2008-4854 2783-2538 |
language | fas |
last_indexed | 2024-03-07T22:06:13Z |
publishDate | 2018-12-01 |
publisher | Semnan University |
record_format | Article |
series | مجله مدل سازی در مهندسی |
spelling | doaj.art-70928ff4c02c42f3a965c7fa4a4764b62024-02-23T19:05:45ZfasSemnan Universityمجله مدل سازی در مهندسی2008-48542783-25382018-12-01165520921910.22075/jme.2018.12832.12593471Comparing the optimization of prestressed concrete bridge deck according to the AASHTO LRFD and AASHTO standard procedures using Cuckoo algorithm.zahra hazrati moghim0ali kheyroddin1Hosein Naderpour2Hossein Rahmani3Civil engineering faculty. Semnan university.semnan.iranProfessor, Faculty of Civil Engineering, Semnan University, Semnan, Irancivil engineering faculty-Semnan university-Semnan-IranShahid Nikbakht faculty-zehedan-IranThe high cost and time of implementation of the bridgeworks necessitate the optimization in the structural design. The optimization can extensively reduce the used steel, reinforcement, concrete and the time of doing project. In this study the effect of design elements in optimization of a bridge have been investigated. By definition of cross section geometry, strength of material, location and number of pre-stressing cables as variable and also using Cuckoo algorithm, the best value of variables are selected and the best geometry of cross area is choice. These variables in fact are calculated based on two regulations AASHTO LRFD-2015 and standard 2002 and the results are compared. The results show that the weight minimalist and economic plan are not depended directly because of the effect of concrete, steel and pre-stressed cables and also the high strength concrete used in long bridge span. Finally, for comparison of the bridge span effect, the optimization is carried out for different lengths from 30 to 70 based on the pointed regulations in above and the results are comparedhttps://modelling.semnan.ac.ir/article_3471_0aa1bf2708538d378b30c83d9f0f8a25.pdfoptimization؛ bridge deck؛ concreat؛ prestressedcuckoo algorithm |
spellingShingle | zahra hazrati moghim ali kheyroddin Hosein Naderpour Hossein Rahmani Comparing the optimization of prestressed concrete bridge deck according to the AASHTO LRFD and AASHTO standard procedures using Cuckoo algorithm. مجله مدل سازی در مهندسی optimization؛ bridge deck؛ concreat؛ prestressed cuckoo algorithm |
title | Comparing the optimization of prestressed concrete bridge deck according to the AASHTO LRFD and AASHTO standard procedures using Cuckoo algorithm. |
title_full | Comparing the optimization of prestressed concrete bridge deck according to the AASHTO LRFD and AASHTO standard procedures using Cuckoo algorithm. |
title_fullStr | Comparing the optimization of prestressed concrete bridge deck according to the AASHTO LRFD and AASHTO standard procedures using Cuckoo algorithm. |
title_full_unstemmed | Comparing the optimization of prestressed concrete bridge deck according to the AASHTO LRFD and AASHTO standard procedures using Cuckoo algorithm. |
title_short | Comparing the optimization of prestressed concrete bridge deck according to the AASHTO LRFD and AASHTO standard procedures using Cuckoo algorithm. |
title_sort | comparing the optimization of prestressed concrete bridge deck according to the aashto lrfd and aashto standard procedures using cuckoo algorithm |
topic | optimization؛ bridge deck؛ concreat؛ prestressed cuckoo algorithm |
url | https://modelling.semnan.ac.ir/article_3471_0aa1bf2708538d378b30c83d9f0f8a25.pdf |
work_keys_str_mv | AT zahrahazratimoghim comparingtheoptimizationofprestressedconcretebridgedeckaccordingtotheaashtolrfdandaashtostandardproceduresusingcuckooalgorithm AT alikheyroddin comparingtheoptimizationofprestressedconcretebridgedeckaccordingtotheaashtolrfdandaashtostandardproceduresusingcuckooalgorithm AT hoseinnaderpour comparingtheoptimizationofprestressedconcretebridgedeckaccordingtotheaashtolrfdandaashtostandardproceduresusingcuckooalgorithm AT hosseinrahmani comparingtheoptimizationofprestressedconcretebridgedeckaccordingtotheaashtolrfdandaashtostandardproceduresusingcuckooalgorithm |