Risk-based maintenance scheduling of generating units in the deregulated environment considering transmission network congestion
In restructured power systems, the traditional approaches of unit maintenance scheduling (UMS) need to undergo major changes in order to be compatible with new competitive structures. Performing the maintenance on generating units may decrease the security level of transmission network and result in...
Main Authors: | Hessam Golmohamadi, Maryam Ramezani, Amir Bashian, Hamid Falaghi |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2014-01-01
|
Series: | Journal of Modern Power Systems and Clean Energy |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8940917/ |
Similar Items
-
Power Transmission Scheduling for Generators in a Deregulated Environment Based on a Game-Theoretic Approach
by: Bingtuan Gao, et al.
Published: (2015-12-01) -
Pre-disaster transmission maintenance scheduling considering network topology optimization
by: Weixin Zhang, et al.
Published: (2023-01-01) -
Short-term Transmission Maintenance Scheduling Considering Network Topology Optimization
by: Weixin Zhang, et al.
Published: (2022-01-01) -
Multi-Stage Transmission Network Planning Considering Transmission Congestion in the Power Market
by: Yixin Huang, et al.
Published: (2020-09-01) -
Improving scheduling performance in congested networks
by: Arif Husen, et al.
Published: (2021-11-01)