Performance of small reservoirs in Tulang Bawang Watershed for microhydro power plant
Recurring floods in the Tulang Bawang River have led to significant losses. In response, the government and local engineers have taken steps to manage flood events and harness excess water for electrical energy generation through the construction of five small reservoirs in the Tulang Bawang watersh...
Main Authors: | Kastamto, Musa Sabariah, Pratiwi Dian, Hadie Muhammad Subhi Nurul, Samsudin Norsuhana, Radja |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2023-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/101/e3sconf_icdmm2023_13002.pdf |
Similar Items
-
Flood analyses at downstream of Cimadur River in Upper Cimadur Basin using HEC-RAS
by: Kastamto, et al.
Published: (2023-01-01) -
Development of microhydro generator system
by: Ahmad Zubaidi, Abdul Aziz @ Md Rani
Published: (2010) -
Private Forest Management in Tulang Bawang Barat
by: Early Anatika, et al.
Published: (2019-02-01) -
Design and fabrication of microhydro power generation/
by: 180273 Roslan Ramli
Published: (1983) -
The Managerial Performance of Megou Pak Tulang Bawang University
by: Okta Malinda, et al.
Published: (2022-08-01)