Providing a model to optimize preventive maintenance schedules for multi-component systems using GA
In this paper, a non-periodic preventive maintenance scheduling optimization model for multi-component systems is provided based on the maximum availability of system components. In addition to providing the required level of system reliability and satisfy other system constraints (maintenance activ...
Main Authors: | , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Allameh Tabataba'i University Press
2019-12-01
|
Series: | Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī |
Subjects: | |
Online Access: | https://jims.atu.ac.ir/article_10562_82f4a5aba2a8184cf4f3268a4d4c5a4d.pdf |
Summary: | In this paper, a non-periodic preventive maintenance scheduling optimization model for multi-component systems is provided based on the maximum availability of system components. In addition to providing the required level of system reliability and satisfy other system constraints (maintenance activities and available resources), total costs (direct and indirect) associated with minimal maintenance and, if necessary, one of the maintenance activities include in inspected and serviced simple, preventive repair and preventive replacement for each component, is proposed. Each of these activities uses various sources and regarding the position of the repairing component, effects differently on the reliability of the system. The costs considered include in direct costs (simple service, repair and replacement) as well as indirect costs (out of order and random failures). Since the proposed model has a complex structure, in order to solve the problem, the Genetic Algorithm (G.A) has been used and the results is presented. In the end, performance and use of this model, for a 10-part series - parallel is presented in the form of a case study. |
---|---|
ISSN: | 2251-8029 2476-602X |